Major Works and Repairs Framework Tender
SHROPSHIRE TOWNS AND RURAL HOUSING LIMITED
- Value
- Not stated · check listing
- Closes
- Not stated · check listing
- Where
- United Kingdom
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering construction and works. Bids are invited through a framework agreement. Delivery covers United Kingdom (Europe). It is classified under Energy Efficiency, Sustainable Buildings and Waste Reduction against the sustainability taxonomy rather than matched on keywords.
Summary
STAR Housing seeks a multi-lot framework for property maintenance, repairs, refurbishment and capital works across its housing stock, with eight specialist lots (electrical, mechanical, major works, healthy homes, drainage, pest control, tree works, scaffolding, waste). Bidders must be pre-qualified contractors with technical capability, financial standing and operational capacity to deliver housing maintenance and improvement works safely and to high standards.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Shropshire Towns and Rural Housing Limited (trading as STAR Housing, based in Shropshire) is establishing a four-year Major Works & Repairs Framework. The framework creates a panel of pre-qualified suppliers for property maintenance, repair, refurbishment and capital improvement works across STAR Housing's housing stock, so that individual procurement exercises are not needed for each requirement. It is being procured under the Procurement Act 2023 using a Competitive Flexible Procedure. The framework is divided into eight Lots, although the notice's Lot list shows nine entries because Lot 1 is split into 1a (Electrical) and 1b (Mechanical). The Lots are: Lot 1a Electrical; Lot 1b Mechanical; Lot 2 Major Works and Major Voids; Lot 3 Healthy Homes; Lot 4 Drainage; Lot 5 Pest Control; Lot 6 Tree Works; Lot 7 Scaffolding; and Lot 8 Waste Management. Lot 2 is an end-to-end principal contractor route covering planned maintenance, capital investment, major void refurbishment, external works, estate improvements, and planned and reactive highways maintenance. Lot 3 covers internal and external adaptations, specialist equipment, damp, mould and condensation remediation, and specialist surveys and investigations when instructed. The notice does not give detailed scopes for the other Lots beyond their titles. Suppliers are encouraged to use local labour, apprenticeships, specialist subcontractors and regional supply chains. The notice states an intention to support SMEs and local and regional suppliers. The expected framework duration is four years. The notice does not state the estimated total value of the framework or individual Lot values. Procedure stages are: (1) Conditions of Participation through completion of a Pre-Qualification Questionnaire (PSQ); (2) Invitation to Tender (ITT); and (3) Interview. Full application details are in Document 1 (Information and Instructions), and Document 5 summarises each Lot and its minimum requirements.
Bidder eligibility
Bidders must satisfy the Conditions of Participation by completing the PSQ. The notice refers to suppliers demonstrating technical capability, financial standing and operational capacity to deliver works safely and to a consistently high standard. Specific thresholds, registrations, certifications, references and prior-experience requirements are not stated on the page; they are set out in Document 1 (Information and Instructions) and Document 5 (Lot summary and minimum requirements). Proportionate financial and technical requirements are said to apply to specialist Lots to encourage participation by competent local and regional SMEs.
How bids are scored
The ITT stage is scored 60% Quality and 40% Price. Quality and price sub-criteria, and any minimum thresholds, are not disclosed on this page. An Interview stage follows the ITT. Further detail is in Document 1 and Document 5.
Lots
- Lot 1a: Electrical
Electrical works under the Major Works & Repairs Framework. Detailed scope and minimum requirements are in Document 5.
- Lot 1b: Mechanical
Mechanical works under the Major Works & Repairs Framework. Detailed scope and minimum requirements are in Document 5.
- Lot 2: Major Works and Major Voids
End-to-end solution for larger and more complex programmes, appointing one Principal Contractor. Covers planned maintenance, capital investment, major void refurbishment, external works, estate improvements, and planned and reactive highways maintenance. Includes coordination of programmes, resident engagement and health and safety.
- Lot 3: Healthy Homes
Dedicated service for internal and external adaptations, specialist equipment, damp, mould and condensation remediation, and additional specialist surveys and investigations where instructed by STAR Housing.
- Lot 4: Drainage
Drainage works under the Major Works & Repairs Framework. Detailed scope is in Document 5.
- Lot 5: Pest Control
Pest control services under the Major Works & Repairs Framework. Detailed scope is in Document 5.
- Lot 6: Tree Works
Tree works under the Major Works & Repairs Framework. Detailed scope is in Document 5.
- Lot 7: Scaffolding
Scaffolding services under the Major Works & Repairs Framework. Detailed scope is in Document 5.
- Lot 8: Waste Management
Waste management services under the Major Works & Repairs Framework. Detailed scope is in Document 5.
Key requirements
- Pre-qualified panel of contractors across eight specialist lots (electrical, mechanical, major works, healthy homes, drainage, pest control, tree works, scaffolding, waste management)
- Technical capability, financial standing and operational capacity to deliver works safely and to high standard
- Ability to handle planned maintenance, capital investment, major void refurbishment, external works, estate improvements and highways maintenance
- Compliance with Procurement Act 2023 and transparent, auditable procurement process
- Encouragement of competition and participation from SMEs and local/regional suppliers
Relevant sectors
How this compares
About this sector
About this sector
Energy efficiency funding covers building retrofits, industrial process upgrades, heat recovery, efficient equipment and demand reduction. It arrives as grants for audits and capital works, as support schemes run by agencies and utilities or as public tenders for retrofit and energy services. Applicants usually need a baseline of current energy use and a measured saving.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in framework agreements; typical only, not this buyer’s list. Check the official notice.
- Selection questionnaire or qualification form
- Company registration certificate
- Audited financial statements
- Insurance certificates
- Case studies or references for similar work
- Quality, health and safety, and environmental policies