Measuring and control equipment: modification of in-reactor control complex at Bohunice
Original: Measuring and control equipment – Modifikácia systému Komplexu vnútro-reaktorovej kontroly (KVRK) v EBO
Slovenské elektrárne, a.s.
- Value
- Not stated · check listing
- Closes
- 17 Dec 2026
- Where
- Slovakia
- Contract
- Mixed · Utility
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a utility covering a mix of works, supplies and services. Delivery covers Slovakia (Europe). It is classified under Fusion and Nuclear against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures the modification and modernisation of the in-reactor control complex (KVRK) for units 3 and 4 at Bohunice NPP, to address obsolescence, reach BT3 safety classification, and secure network safety. It suits established nuclear I&C engineering and supply firms with safety-qualified track records, not early-stage startups.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The procurement covers the modification of the In-Core Instrumentation Complex (KVRK, Komplex vnútro-reaktorovej kontroly) system at Units 3 and 4 of the Bohunice Nuclear Power Plant (EBO), operated by Slovenské elektrárne, a.s. The work includes modernising the system because its components are obsolete and spare parts are increasingly hard to obtain. The modification is intended to bring the system into compliance with Decree No. 430/2011 Z. z. of the Nuclear Regulatory Authority of the Slovak Republic, which classifies the system as a selected piece of equipment in safety class BT3. It also aims to provide network security for the system and to ensure its long-term reliable operation in monitoring the reactor core and verifying compliance with nuclear safety limits and conditions. The notice does not state the contract duration, individual deliverables, or the delivery schedule.
Key requirements
- Modernise KVRK system on Bohunice units 3 and 4 due to obsolescence and spare-part scarcity
- Meet Slovak nuclear regulator decree 430/2011 requirements for BT3 safety classification
- Ensure network security and long-term reliable reactor core monitoring and safety-limit control
Relevant sectors
How this compares
About this sector
About this sector
Fusion and nuclear funding backs advanced reactor designs, small modular reactors, fuel cycles, materials and the supply chain behind them. Most of it is public research and milestone-based development money, with strict security and safety requirements. Calls typically favour teams with specialist facilities, licensing knowledge and established research partners.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)