Metrovalencia tram network renovation, phase 1, lines 4, 6, 8
Original: City railway construction work – Obras de renovación de la red tranviaria de Metrovalencia. Fase 1. Línea 4, 6 y 8 Metrovalencia (FGV). T.M. València y Burjassot (València).
Gerencia de Ferrocarrils de la Generalitat Valenciana
- Value
- Not stated · check listing
- Closes
- 11 Jan 2027
- Where
- Spain
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
Pro early accessIn public feeds and alerts from 2 Dec. This page is open to everyone now.
In context
This is a contract notice published by a government body covering construction and works. Delivery covers Spain and the European Union (Europe). It is classified under Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures renovation works on the Metrovalencia tram network, covering track, rail, switch and platform repairs on Lines 4, 6 and 8 in València and Burjassot. It suits experienced rail and civil engineering contractors able to deliver large, phased urban track works.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
La red tranviaria de Metrovalencia inauguró su primer tramo en 1994, siendo València la primera ciudad que reintroducía este sistema de transporte. La red tranviaria actual cuenta con las siguientes líneas y tramos: Línea 4, Línea 6, Línea 8 y Línea 10. Alguno de los tramos tiene casi 30 años en servicio, definiéndose algunos problemas en la infraestructura y superestructura de vía que deben corregirse. En concreto, desgaste de carril, desgaste de aparatos de vía, desperfectos en el acabado superficial de la plataforma, defectos en cruces a nivel y en la plataforma compartida con autobús, defectos de drenaje y deterioro del prisma de instalaciones y otros elementos. En términos generales FGV considera que la losa de hormigón se encuentra en buen estado aunque en algún punto concreto está fracturada (por cruces de colector que ha tenido asentamiento, etc.) o arrastre de finos. FGV indica que esta actuación queda contemplada, en toda la red tranviaria de Metrovalencia, en diferentes fases, en función de los estudios y trabajos previos desarrollados por FGV y empresas externas en el marco de diferentes Contratos. Dentro de los tramos prioritarios para FGV se define el alcance del presente Proyecto Constructivo.
Key requirements
- Renovation of rail superstructure and infrastructure on tram Lines 4, 6 and 8
- Repair of rail wear, switch wear, platform surface defects and level crossings
- Drainage defect correction and deteriorated slab and installation repairs
Relevant sectors
How this compares
About this sector
About this sector
Climate-related engineering and infrastructure covers water and wastewater systems, flood defences, transport and rail, electricity networks and environmental studies. Almost all of it is public procurement for design, studies and works, often under framework agreements. Bidders are usually assessed on technical capacity, professional accreditation and delivery of comparable schemes.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)