This tender closed on 22 June 2026. The deadline passed 156 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Miscellaneous engineering services – BB West - Line 6 gap closure
Original: Miscellaneous engineering services – BB West - Lückenschluss Linie 6
Stadtwerke Augsburg Holding GmbH, Bau-Einkauf
- Value
- Not stated · check listing
- Closes
- 22 Jun 2026Closing date passed
- Where
- Germany
- Contract
- Services · Utility
In context
This is a contract notice published by a utility covering services. Delivery covers Germany (Europe). It is classified under Electric Mobility against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures construction-phase measurement and documentation services to monitor stray-current protection measures for DC railway infrastructure on Augsburg's tram line 6 extension. Qualified bidders should have expertise in electrical engineering measurements, railway electrification safety, and construction site monitoring.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
The procurement covers the execution and documentation of construction-accompanying measurements for protective measures against stray current effects caused by DC traction systems ('Schutzmaßnahmen gegen Streustromwirkungen durch Gleichstrombahnen'). The works are located on the route from Vorplatz-West to Luitpoldbrücke as part of the gap closure (Lückenschluss) of tram Line 6 in Augsburg. The service includes carrying out and documenting monitoring measurements during the construction phase to assess and mitigate stray current impacts from direct-current railway operations on surrounding infrastructure. The execution period is scheduled from August 2026 to November 2027, with a possible extension to November 2028 depending on construction progress at the main railway station (HBF). The latest start of services is August 2026, subject to the progress of track construction works.
Key requirements
- Execution and documentation of construction-phase measurements for stray-current protection on DC railway
- Work on tram line 6 extension (Vorplatz-West to Luitpoldbrücke)
- Performance period August 2026 to November 2027 (potentially extended to November 2028 pending main station construction progress)
- Coordination with ongoing track construction and strict adherence to construction schedules
CPV codes
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Electric mobility funding supports electric vehicles, charging infrastructure, battery supply chains and fleet transition for buses, vans and trucks. Public authorities buy vehicles and charge points through tenders, while grants back pilots and manufacturing. Applicants usually need site plans, grid capacity checks and an operator for the finished assets.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)