Modification works for air conditioning and ventilation at Jean-Bouchard amphitheatre, Saint-Janvier
Original: Travaux de modification de la climatisation et de la ventilation à l'amphithéâtre Jean-Bouchard, dans le secteur de Saint-Janvier
Ville de Mirabel
- Value
- Not stated · check listing
- Closes
- 26 Nov 2026
- Where
- Canada
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering construction and works. Delivery covers Canada (NORTH-AMERICA). It is classified under Energy Efficiency and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
The City of Mirabel is tendering works to upgrade the air conditioning, dehumidification and ventilation systems serving the two ice rinks at the Jean-Bouchard amphitheatre. A local mechanical or HVAC contractor with municipal works experience would fit this single-site building-systems job.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The City of Mirabel (Ville de Mirabel) is seeking bids for modifications to the air conditioning and ventilation systems at the Jean-Bouchard amphitheatre, located at 17750 rue du Val-d'Espoir, Mirabel, Quebec J7J 1X7, in the Saint-Janvier sector. The project aims to optimize and upgrade the air management systems of the Jean-Bouchard complex. The primary objective is to upgrade the air conditioning and dehumidification systems serving the two ice rinks, meeting comfort requirements while ensuring technical compliance and building safety. The detailed scope of work is set out in the general requirements of the technical specifications (devis technique), which are available only through the third-party bidding portal. The estimated contract duration is 3 months. The notice is a Request for Proposal under competitive open bidding, subject to the Canadian Free Trade Agreement (CFTA).
Key requirements
- Upgrade air conditioning and dehumidification for both ice rinks
- Modify ventilation systems at Jean-Bouchard amphitheatre, 17750 rue du Val-d'Espoir, Mirabel
- Ensure technical compliance and building safety per the general technical specifications
Procurement contact
The notice names a procurement contact for clarification questions.
Relevant sectors
How this compares
About this sector
About this sector
Energy efficiency funding covers building retrofits, industrial process upgrades, heat recovery, efficient equipment and demand reduction. It arrives as grants for audits and capital works, as support schemes run by agencies and utilities or as public tenders for retrofit and energy services. Applicants usually need a baseline of current energy use and a measured saving.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)