Modular Building Project 2026 Tender
Original: Modular Building Project – Dillon, Saskatchewan
Royal Canadian Mounted Police (RCMP)
- Value
- Not stated · check listing
- Closes
- 9 Dec 2026
- Where
- Canada
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering construction and works. Bids are invited through a restricted procedure. Delivery covers Canada (NORTH-AMERICA). It is classified under Renewable Energy and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
The RCMP is procuring full design-build construction of a new ~800 sq m modular police building, a 75 sq m garage, a lift station, site servicing, and a self-contained solar PV system at Dillon, Saskatchewan, with completion by March 2029. Bidders must be Canadian, pass a two-phase prequalification with security requirements, and have capacity for a large modular construction project.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The Royal Canadian Mounted Police (RCMP) is procuring full design-build-style construction services to construct, transport, and set up a new modular contained use building, a storage building, and site development at an existing site in Dillon, Saskatchewan (solicitation M5000-26-2255/A). Scope includes construction of an approximately 800 sq m single-storey wood-framed modular building on crawl space (office space, garage, storage and contained use areas), a 75 sq m single-storey wood-framed garage, high-quality interior finishes, millwork, glazing and doors, structural, mechanical and electrical systems with emergency backup power, a lift station, and site development including underground services, grading, signage, lighting and granular surfacing. A self-contained solar photovoltaic system is also included. The work must be completed by March 31, 2029. The estimated contract period is 26 months with a proposed start date of January 20, 2027. The procurement is a two-phase competition. Phase One pre-qualifies bidders against mandatory requirements in the Request for Qualifications; Phase Two invites qualified bidders to submit a financial bid based on the specifications and drawings. Pre-qualification status is valid for 60 days from notification or until contract award in Phase Two, whichever comes first. No further RFQ will be published. The requirement carries a security requirement (SRCL, Dillon site details document provided).
Bidder eligibility
Open only to Canadian suppliers (Policy on Reciprocal Procurement). Bidders must meet the mandatory requirements set out in the attached Request for Qualifications to be pre-qualified and receive the ITT, specifications and drawings. A security requirement applies (Security Requirements Check List, SRCL, for Dillon). RCMP applies the Ineligibility and Suspension Policy administered by Public Services and Procurement Canada. Canadian content policy applies (Policy on Prioritizing Canadian Suppliers and Canadian Content). Indigenous businesses may register in the federal Indigenous Business Directory for set-aside eligibility. Specific RFQ mandatory experience and financial thresholds are contained in the attached documents and are not stated on the notice page.
How bids are scored
Phase One: pass/fail pre-qualification against mandatory requirements in the RFQ. Phase Two: contract awarded to the lowest-priced compliant financial bid. No price/quality weighting disclosed.
Key requirements
- Two-phase process: Phase One prequalification on mandatory RFQ requirements, Phase Two financial bid
- Full design, transport, and set-up of modular building, garage, lift station, and site development by 31 March 2029
- Self-contained solar PV system and emergency backup power; Canadian suppliers only with a security requirement
Procurement contact
The notice names a procurement contact for clarification questions.
Relevant sectors
How this compares
About this sector
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)