Skip to content
Raise Lens
Tender · TED (EU)

Multi-functional buildings construction work – Contractor Building Team Huis de Misse Bernheze

Original: Multi-functional buildings construction work – Aannemer Bouwteam Huis de Misse Bernheze

Gemeente Bernheze

Value
Not stated · check listing
Closes
5 Jan 2027
 
Where
Netherlands
Contract
Mixed · Government

Free accounts: 1 official link a month · Pro: every link

Pro early accessIn public feeds and alerts from 28 Nov. This page is open to everyone now.

Raise Lens Pro

With Pro you could have had 45 days to prepare

See Raise Lens Pro
With Raise Lens Pro · seen 21 Nov 202645 days to prepare
Found today · 24 Nov 202642 days to prepare

In context

This is a contract notice published by a government body covering a mix of works, supplies and services. Bids are invited through a restricted procedure. Delivery covers Netherlands and the European Union (Europe). It is classified under Sustainable Buildings against the sustainability taxonomy rather than matched on keywords.

Summary

A Dutch municipality seeks a contractor to join a design-build team that renovates and extends the Huis De Misse multifunctional community building in Heesch, covering both building and installation works. It suits established construction firms able to handle design-phase services and full building delivery, not early-stage sustainability startups.

Summary by Raise Lens from the official notice · 23 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The Municipality of Bernheze is procuring a building contractor under a design-and-build team (bouwteam) contract for the renovation and extension of Het Huis De Misse in Heesch. The project will combine the current accommodation of the municipality, Sociaal Cultureel Centrum De Pas and De Bibliotheek Heesch, currently housed at De Misse 2, 4 and 6, with the educational and creative centre De Eijnderic, to create an integrated, open, multifunctional and welcoming shared facility in the centre of Heesch. A Spatial, Functional and Technical Programme of Requirements (PvE), prepared by ICS adviseurs, sets out the shared requirements of the partner organisations and is attached as annexes 3 and 4 to the selection memorandum. The municipality intends to develop this PvE into an integrated design for the renovation and extension. From the DO (preliminary design) phase, the contractor will support the design team and carry out the remainder of the design phase within the bouwteam structure. The other advisers will join the bouwteam as advisers to the client. The first deliverable is a Definitief Ontwerp (DO, definitive design) with an accompanying cost estimate, on which the Bernheze municipal council is to decide in its December 2027 meeting whether to proceed. Following a Technisch Ontwerp (TO, technical design), the contractor is then to be commissioned to prepare the Uitvoeringsgereed Ontwerp (UO, construction-ready design) and to realise the design. The contract therefore combines service provision by the contractor during the bouwteam phase with the construction works. The contractor must cover both the building (bouwkundig) and building-services (installatietechnisch) components of the renovation and extension, and may bring in an installer as subcontractor or team participant. Because design and construction are combined in one assignment, the procurement is treated as a integrated (samengevoegde) contract. The municipality has decided not to divide the assignment into lots, on the grounds that lotting would undermine the bouwteam objectives and create risks over the allocation of responsibilities.

Bidder eligibility

Bidders must be contractors able to take on the building-team role covering both building and installation works, with the option to include an installer as subcontractor or team participant. The full selection criteria (required registrations, references, prior experience and financial thresholds) are set out in the selectieleidraad (selection memorandum), which is not included in the page text provided.

How bids are scored

Not disclosed in the page text provided. The selection memorandum is referenced but its scoring method and any price/quality weighting are not stated here.

Key requirements

  • Contractor joins design team from DO phase within a building team construction model
  • Covers both structural building and installation technical works for renovation and extension
  • Must support Definitive Design and cost estimate for council decision in December 2027

CPV codes

Relevant sectors

How this compares

About this sector

Sustainable buildings funding covers low-energy new build, deep retrofit, building performance data and healthier indoor environments. Public owners procure design and works through tenders, while grants support innovation and community schemes. Bids are usually judged on measured performance, cost and delivery experience in occupied buildings.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceTED (EU)
Published20 Nov 2026
Closes5 Jan 2027, 00:00 UTC
Buyer typeGovernment
TypeMixed
MethodRestricted
DeliveryOn-site
CountryNetherlands
RegionEurope
CurrencyEUR
Last verified23 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)