Multi-Party Framework Agreement for Provision of Energy Efficient Design Services and Measurement and Verification Activities associated with Climate Action and Low Carbon Development Goal Projects 2026 Tender
Cork City Council
In context
This is a contract notice published by a government body covering services. Bids are invited through a framework agreement. Delivery covers Ireland (Europe). It is classified under Energy Efficiency, Sustainable Buildings and Climate Software and Data and 1 other against the sustainability taxonomy rather than matched on keywords.
Cork City Council seeks a multi-party framework agreement for energy-efficient design services and measurement & verification activities supporting climate action and low-carbon development projects from 2026–2028. Bidders should be engineering/sustainability consultancies with expertise in energy audits, building performance modelling, and M&V protocols.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Cork City Council is procuring a Multi-Party Framework Agreement for the provision of energy efficient design services and measurement and verification (M&V) activities associated with Climate Action and Low Carbon Development Goal projects. The CfT is titled as covering 2026-2028 and is classed as Works Related Services under Directive 2014/24/EU (Classic). The procurement establishes a framework agreement with multiple providers rather than a single contract. The CPV codes indicate scope spanning energy-efficiency consultancy, engineering design, environmental engineering consultancy, environmental standards for construction, energy-related services, and general architectural, construction, engineering and inspection services. The location is NUTS IE053 (Cork). The contract duration is stated as 3 years, including any options and renewals. The framework timeframe field is marked N/A. The tender is not divided into lots, does not use e-auctions, is not EU-funded, and does not accept multiple tenders. Tenders must remain valid for 180 days. The page does not provide a detailed scope of works, deliverables, or a service specification beyond the title and CPV codes.
How bids are scored
Evaluation mechanism is Most Economically Advantageous Tender (MEAT). The page does not disclose price/quality weightings or sub-criteria. Different evaluation mechanisms are permitted in the mini-competition stage ("Allow different Evaluation Mechanism in the MC/SC: Yes").
Key requirements
- ✓Energy-efficient design services for climate action and low-carbon projects
- ✓Measurement and verification (M&V) activities and monitoring
- ✓Multi-party framework agreement structure (2026–2028)
- ✓Expertise in building performance assessment and carbon reduction strategies
Relevant sectors
How this compares
- Compared with 49 similar tenders (efficiency in Ireland) listed in the last 12 months.
- Similar tenders that state a value range from $55k to $440m, with a median of $1.1m (16 tenders).
- It allows 32 days to respond, longer than the typical 27 days across 38 similar tenders.
- The same organisation listed 2 other similar tenders here in the last 12 months.
Closest open tenders
- BE3917F - RFT to establish a Single Supplier Framework for the Supply, Delivery, Installation and Support of a Campus Occupancy Sensing Solution for Trinity College Dublin (TCD)
- Energy-management services – Energy Management Information System
- Cherry Orchard Hospital - Blackthorn unit, Community Day Care Refurbishment
- C1190_CFT9283830_Mechanical_Electrical Contractor (Includes PSCS) - Refurbishment of Toilet Facilities - 2 Tipperary FET Colleges - Cappawhite E34 A320 - CTI Clonmel E91K2E2
- Readvertisement Year 3 of Panel for suitable Service Providers for the provision of Environmental and Energy Management Training Courses and Demonstration in 2 Lots
Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.
About this sector
Energy efficiency funding covers building retrofits, industrial process upgrades, heat recovery, efficient equipment and demand reduction. It arrives as grants for audits and capital works, as support schemes run by agencies and utilities or as public tenders for retrofit and energy services. Applicants usually need a baseline of current energy use and a measured saving.
Free accounts: 1 official link a month · Pro: every link
Quick facts
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →