Skip to content
Raise Lens
Tender · eTenders (Ireland)Closed

NMBI RFT for Solar Power Panels Installation 2026 Tender

Bord Altranais agus Cnáimhseachais na hÉireann Nursing and Midwifery Board of Ireland

Value
€50K
Closes
11 Sep 2026Closing date passed
Where
Ireland
Contract
Mixed · Government

In context

This is a contract notice published by a government body covering a mix of works, supplies and services. Bids are invited through an open procedure. Delivery covers Ireland and the European Union (Europe). It is classified under Renewable Energy, Energy Efficiency and Sustainable Buildings against the sustainability taxonomy rather than matched on keywords.

Summary

This tender procures design, supply, installation, commissioning, and maintenance of a 37 kW rooftop solar PV system for a government office building in Dublin. Bidders should be solar installation contractors or engineering firms with commercial PV system experience and Irish/EU compliance expertise.

Summary by Raise Lens from the official notice · 9 Sept 2026Accurate?

This tender has closed

Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.

About this tender

The Nursing and Midwifery Board of Ireland (NMBI) seeks proposals for the design, supply, installation, commissioning, and maintenance of a 37 kW (approximately) solar photovoltaic (PV) system to be mounted on the roof of the corporate offices in Blackrock, Co. Dublin. The system will be installed on a commercial property and must comply with all relevant Irish and EU standards. The contract duration is 24 months, including installation, commissioning, and maintenance services.

Bidder eligibility

Bidders must be eligible to tender for public contracts under Irish and EU procurement regulations (2014/24/EU Classic Procedure). Suppliers must demonstrate capability to design, supply, install, commission, and maintain solar PV systems compliant with Irish and EU standards. No specific prior experience or financial standing thresholds are explicitly stated in the tender notice.

How bids are scored

Most Economically Advantageous Tender (MEAT) evaluation mechanism will be applied. Specific weighting between price and quality factors is not disclosed in the notice.

Key requirements

  • Design and supply of 37 kW solar photovoltaic system
  • Rooftop installation on commercial property in Blackrock, Dublin
  • Compliance with Irish and EU standards
  • Commissioning and maintenance services
  • System mounted on corporate office building

Procurement contact

The notice names a procurement contact for clarification questions.

How this compares

About this sector

Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.

This opportunity has closed. Find the next one

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Alert me to similar opportunities →

Quick facts

SourceeTenders (Ireland)
Published16 Jul 2026
Closes11 Sep 2026, 14:00 UTC
Buyer typeGovernment
TypeMixed
MethodOpen
DeliveryOn-site
CountryIreland
RegionEurope
CurrencyEUR
Value (USD)$55K
Budget range€50K
SubmissionOnline via ireland-etenders e-procurement portal. Tender opening scheduled for 2
Last verified9 Sep 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)

Related tenders