North Macedonia: BRT Line 1 Corridor plus Novo Lisiche Depot and upgrades in Gjorche Petrov Depot, GrCF2: Skopje Bus Rapid Transit Project
- Value
- Not stated · check listing
- Closes
- 30 Nov 2026
- Where
- North Macedonia
- Contract
- Works · Multilateral
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a multilateral institution covering construction and works. Delivery covers North Macedonia (Europe). It is classified under Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
This works contract covers construction of the BRT Line 1 corridor in Skopje, plus a new Novo Lisiche bus depot and upgrades to the Gjorche Petrov depot. It suits large civil engineering contractors and consortia with urban rail or bus infrastructure experience, with SME participation mainly as subcontractors.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The City of Skopje, North Macedonia, invites prequalification for works on the BRT Line 1 Corridor, the construction of Novo Lisiche Depot, and upgrades to Gjorche Petrov Depot, under the Skopje Bus Rapid Transit Project (EBRD Project ID 51752). The procurement is a works contract issued as an Invitation for Prequalification under an open two-stage tender with prequalification (PQQ). The client intends to use part of the proceeds of a loan or grant administered by the EBRD towards the contract cost. The procurement is governed by the Bank's Procurement Policies and Rules and is open to firms from any country unless the procurement documents specify otherwise. Detailed technical and financial requirements, any lot information, expected outcomes, contract start date, planned duration, and response requirements are contained in the procurement documentation, which is available free of charge through the EBRD Client E-Procurement Portal (ECEPP) after registration. The notice itself does not state the scope in further detail or the contract duration.
Bidder eligibility
Open to firms from any country, unless otherwise specified in the procurement documents, consistent with EBRD Procurement Policies and Rules. Specific eligibility and qualification requirements (registrations, experience, financial thresholds) are set out in the prequalification documentation accessible via ECEPP and are not stated in the notice.
Key requirements
- Construction of BRT Line 1 corridor in Skopje
- Construction of new Novo Lisiche bus depot
- Upgrades to existing Gjorche Petrov depot
Procurement contact
The notice names a procurement contact for clarification questions.
Relevant sectors
How this compares
About this sector
About this sector
Climate-related engineering and infrastructure covers water and wastewater systems, flood defences, transport and rail, electricity networks and environmental studies. Almost all of it is public procurement for design, studies and works, often under framework agreements. Bidders are usually assessed on technical capacity, professional accreditation and delivery of comparable schemes.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)