North South Transmission System Interconnection Project 2026 Tender
Saskatchewan Power Corporation (SaskPower)
- Value
- Not stated · check listing
- Closes
- 14 Dec 2026
- Where
- Canada
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering construction and works. Bids are invited through a restricted procedure. Delivery covers Canada (NORTH-AMERICA). It is classified under Grid Modernisation and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
SaskPower is prequalifying experienced EPC contractors to deliver a roughly 250 km twin transmission line and a new 230 kV switching station that link Saskatchewan's northern and southern grids. Bidders need a proven record of large, similar transmission projects, typically a major EPC firm or consortium rather than a small startup.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
SaskPower is seeking to connect its northern and southern grid systems, which are currently not interconnected. Power is currently 'wheeled' through Manitoba in partnership with Manitoba Hydro. The goal is to improve the supply of reliable and safe power to the far north and meet forecast demand in the northern region. The project is described as complex, and SaskPower states it is committed to meaningful and transparent engagement with Indigenous communities and the public. SaskPower is considering two parallel transmission lines of approximately 250 km each to connect the northern and southern systems. The lines would start near the E.B. Campbell Switching Station and connect to the northern grid at the Island Falls Switching Station, routed through the western portion of the Saskatchewan River Delta and through boreal plain and shield ecosites with limited or no road access. The project is also expected to include a new eight-position 230 kV switching station south of E.B. Campbell, with the northern terminal tying into the existing E.B. Campbell station. This notice is a Request for Supplier Qualification (RFSQ), soliciting responses from established, experienced Engineer Procure Construct (EPC) contractors that have delivered transmission line projects of a similar nature. SaskPower intends to select up to two Prequalified Suppliers to take part in an invitational second-stage Request for Proposals (RFP). The second stage is a competitive process and may include early contractor involvement (ECI) activities, such as design optimization, constructability planning, schedule and procurement support, and mitigation of supply chain and labour market risks. Details of the second-stage RFP and general scope of services are in Appendix A of the solicitation documents. The estimated contract period is 57 months, with a proposed start date of 2028-01-15. The procurement is subject to the Canada-European Union Comprehensive Economic and Trade Agreement (CETA). Full solicitation documents are available through MERX, and fees may apply for access.
Bidder eligibility
Respondents must be established and experienced EPC contractors that have successfully delivered transmission line projects of a similar nature. Specific registration, financial threshold, and reference requirements are not stated on the notice and would be set out in the full RFSQ documents (the notice references section 2.3, which is not reproduced here). Access to full details on the MERX third-party site may require an account.
How bids are scored
Not disclosed on the notice page. Stage one is a qualification process to select up to two Prequalified Suppliers. Scoring methodology and any price/quality weightings are not stated and would appear in the RFSQ documents or the Second-stage RFP.
Key requirements
- Proven delivery of transmission line projects of similar nature and scale
- EPC (engineering, procurement, construction) capability for 230 kV infrastructure
- Experience working through boreal, wetland and limited-road-access terrain, with Indigenous and public engagement
Procurement contact
The notice names a procurement contact for clarification questions.
Relevant sectors
How this compares
About this sector
About this sector
Grid modernisation covers transmission, distribution, smart meters, interconnectors and the software that balances a network with more variable supply. Funding comes as innovation calls for network operators and suppliers as well as large public tenders for equipment and works. Applicants are usually asked to show technical readiness and experience working with regulated network companies.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)