ORiW - Design and Integration Partner 2026 Tender
United Utilities Water Limited
- Value
- £600.0M
- Closes
- 30 Nov 2026
- Where
- United Kingdom
- Contract
- Services · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering services. Delivery covers United Kingdom (Europe). It is classified under Water and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
United Utilities is procuring a design and integration partner for the Only Rainwater into Windermere (ORiW) programme, which will deliver wastewater infrastructure to remove public and private sewage discharges and highway runoff from the Windermere catchment, with a £600M estimated value. A large engineering and systems-integration firm or consortium with wastewater design and delivery capacity fits best, as SMEs are unlikely to meet the scale.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
United Utilities Water Limited (UU) is procuring a Design and Integration Partner (D&IP) for the Only Rainwater into Windermere (ORiW) programme, which aims to make Windermere the cleanest lake in England by removing wastewater discharges from public and private sources and addressing highway runoff. The programme is long-term and transformational, intended to protect the lake's ecology, water quality and amenity value, and to reduce the risk of harmful algal blooms. Agricultural impacts are excluded because other programmes are considering them. The ORiW system has several workstreams: First Time Sewerage (connecting unsewered properties to the public network), First Time Treatment (remote treatment where sewerage is not possible), nature-based solutions for surface water and highway runoff, construction of tunnels, sewers and rising mains, and upgrade of an existing wastewater treatment works and discharge point. UU expects the wider infrastructure to be promoted as a Nationally Significant Infrastructure Project through a Development Consent Order, subject to Section 35 approval by Defra. The D&IP will complete feasibility, outline design, constructability and related activities needed to obtain approvals and consents so the programme can proceed to delivery for the preferred solution. Initial scope includes outline design, planning and consents, EIA and surveys, stakeholder and customer engagement, land agency, referencing and surveying, preparing planning applications and the DCO, site investigation, early contractor involvement, and support for Ofwat PR29 reporting, WINEP and DWMP submissions. The D&IP must lead overall delivery strategy, manage programme interfaces, maintain design consistency and integrate the whole system. UU may also require ongoing D&IP support in the delivery phase, which could take the form of a system integrator role, a system integrator and detailed design role, or client-side support, under either the existing framework call-off terms or an evolved 'Enterprise' or alliance-style model. UU states it will aim to keep the D&IP's risk and reward position broadly equivalent to the development-phase arrangements under any alternative model. Indicative values are: D&IP pre-delivery phase over 4 years at circa £60-100m; System Integrator Partner during delivery at up to a further 9 years at circa £100m (subject to CPIH); and System Integrator and Detailed Design Partner during delivery at up to a further 9 years at circa £500m …
Bidder eligibility
The notice does not set out formal bidder eligibility requirements such as registrations, classifications, mandatory references, or financial thresholds. It states that UU requires a D&IP with the capability and experience to coordinate and integrate all elements of the ORiW system, lead the overall delivery strategy, manage interfaces, and deliver the DCO, planning and consent processes. Detailed criteria would be found in the full tender documents.
How bids are scored
No scoring methodology, price/quality split, or weightings are disclosed in the notice text.
Key requirements
- Design and systems integration for the ORiW wastewater programme in the Windermere catchment
- Delivery of First Time Sewerage, First Time Treatment and related workstreams to remove discharges
- Long-term programme aimed at improving lake water quality and reducing algal bloom risk
Relevant sectors
How this compares
About this sector
About this sector
Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)