Skip to content
Raise Lens
Tender · TED (EU)

Photovoltaic cells – supply and installation of 10 kW photovoltaic system

Original: Photovoltaic cells – Furnizare, montaj sistem fotovoltaic cu putere instalata de 10 kw la Pastravaria Lapusna, DS Mures

Value
Not stated · check listing
Closes
8 Dec 2026
 
Where
Romania
Contract
Mixed · Soe

Free accounts: 1 official link a month · Pro: every link

Raise Lens Pro

With Pro you could have had 28 days to prepare

See Raise Lens Pro
With Raise Lens Pro · seen 10 Nov 202628 days to prepare
Found today · 25 Nov 202613 days to prepare

In context

This is a contract notice published by a state-owned enterprise covering a mix of works, supplies and services. Delivery covers Romania (Europe). It is classified under Renewable Energy against the sustainability taxonomy rather than matched on keywords.

Summary

A Romanian state forestry company (Romsilva) is procuring supply and installation of a 10 kW photovoltaic system at its trout farm at Lapusna, Mures county. It suits small local solar installers and electrical contractors with PV installation experience.

Summary by Raise Lens from the official notice · 18 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The buyer, a Romanian state-owned forestry organisation, is procuring the supply and installation of a 10 kW photovoltaic system at its trout farm at Lapusna, in Mures county, Romania. The contract is a mixed supply and works contract, and the work must be delivered on site. Bidders must supply a 10 kW installed-capacity photovoltaic system and install it at the Lapusna trout farm, complying with the specification (caiet de sarcini) and the tender documentation. The subject matter is coded under CPV 31712331. The notice was published on 10 November 2026 and closes on 8 December 2026.

Key requirements

  • Supply of a 10 kW installed-capacity photovoltaic system
  • Installation at Pastravaria Lapusna, DS Mures
  • Compliance with the caiet de sarcini and tender documentation

CPV codes

Relevant sectors

How this compares

How this compares

  • Compared with 45 similar tenders (renewables in Romania) listed in the last 12 months.
  • Similar tenders that state a value range from $8k to $11m, with a median of $164k (6 tenders).
  • It allows 28 days to respond, shorter than the typical 33 days across 31 similar tenders.
  • This is the only similar tender from this organisation listed here in the last 12 months.

Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.

About this sector

Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceTED (EU)
Published10 Nov 2026
Closes8 Dec 2026
Buyer typeSoe
TypeMixed
DeliveryOn-site
CountryRomania
RegionEurope
CurrencyRON
Last verified18 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)