Photovoltaic installation on anthropised spaces 2026 Tender
Original: Instalación de fotovoltaicas en espacios antropizados
Miembros Corporativos titulares de Áreas del Cabildo Insular de la Palma
In context
This is a contract notice published by a government body covering construction and works. Delivery covers Spain (Europe). It is classified under Renewable Energy against the sustainability taxonomy rather than matched on keywords.
This tender procures installation of photovoltaic solar systems on already-urbanised or disturbed sites for the Cabildo Insular de La Palma, valued at about €405,683 excluding VAT. It suits local Spanish construction and renewable-energy installers with PV installation experience.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Procurement of works (tipo de contrato: Obras) for the installation of photovoltaic systems in anthropized (human-altered) spaces, under the Cabildo Insular de La Palma, Canary Islands, Spain. The tender is procured by the corporate members holding areas of the Cabildo. The contract is co-financed by the European Regional Development Fund (FEDER). The CPV codes cover electrical supply installations, solar energy, solar panels, solar installations, low-voltage installations, metal locksmith and carpentry works, and building technical installations. The place of execution is La Palma, Spain. The tender file includes three BC3 cost-breakdown annexes: CV El Roque Muchachos, Depósito Roque Los Muchachos, and CI Caños de Fuego. The procedure is an open simplified procedure (Abierto simplificado) with ordinary processing. The tender notice, specifications (pliego), and other documents were published on 7 October 2026. Contract duration, deliverables in detail, and execution timeline are not stated on the page.
Bidder eligibility
Not stated on the extracted page. Bidder requirements, classifications, solvency, and references would be found in the pliego/annexes, which are not included in the page text.
How bids are scored
Not stated on the extracted page. No price/quality split or weightings are disclosed in the text provided.
Key requirements
- ✓Install photovoltaic solar systems on anthropised (already built or disturbed) spaces
- ✓Public works contract for Cabildo Insular de La Palma, value about EUR 405,683
- ✓Closing date 6 November 2026; check Spanish public procurement platform for solvency and classification requirements
Relevant sectors
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Quick facts
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →