Skip to content
Raise Lens
Tender · simap.ch (Switzerland)

Police Base and Workshop Schmerikon - BKP 230 Electrical Installations

Original: Polizeistützpunkt und Werkhof Schmerikon - BKP 230 Elektroanlage

Kanton St.Gallen, Bau- und Umweltdepartement, Hochbauamt

Value
Not stated · check listing
Closes
30 Nov 2026
 
Where
Switzerland
Contract
Works · Government

Free accounts: 1 official link a month · Pro: every link

Raise Lens Pro

With Pro you could have had 21 days to prepare

See Raise Lens Pro
With Raise Lens Pro · seen 9 Nov 202621 days to prepare
Found today · 24 Nov 20266 days to prepare

In context

This is a contract notice published by a government body covering construction and works. Delivery covers Switzerland (CH-SG). It is classified under Energy Efficiency and Heating and Cooling against the sustainability taxonomy rather than matched on keywords.

Summary

The Canton St.Gallen authority is procuring electrical installation works to renew HVAC control systems, including new switchgear, field devices and cabling, plus 63A fuses for heat pumps, in a police and workshop building. Local electrical contractors with Swiss building-services experience and capacity for an onsite renovation fit best.

Summary by Raise Lens from the official notice · 10 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The contracting authority, Kanton St.Gallen (Hochbauamt), is procuring comprehensive heavy-current and electrical installation works (BKP 23) for the renewal of the HVAC systems within the overall project "Polizeistützpunkt und Werkhof Schmerikon". The project covers the Werkhof (St. Gallerstrasse 61) and the Polizeistation (St. Gallerstrasse 63) in 8716 Schmerikon, SG. Scope includes complete dismantling and new installation of control cabinets (GA), associated field devices and cabling for HVAC and individual room control (ERR) systems across the sectors WERK, POLIZ and ESH. Core elements also include fitting two 63A fuses in the low-voltage main distribution board (NS-HV) for new heat pumps, creating a new electrical circuit for ceiling radiant panels in the garage, and modernising the protective equipotential bonding to current technical standards. An optional extension is included: retrofitting an enhanced individual room control system using EnOcean technology in office and common rooms, which is tendered as an option. Execution runs from 30.01.2027 to 29.11.2028 (contract duration stated as 30.01.2027 to 30.12.2028). Drilling work is expected to start in early January 2027, and the existing refrigeration may only be dismantled and disposed of in autumn 2028 in the worst case, which sets the end of execution at end of November 2028. The contract may not be extended.

Bidder eligibility

EK 1 (Leistungsfähigkeit): sufficient personnel and financial resources to deliver on schedule; evidence required, submitted as self-declaration. EK 2 (Erfahrung): references for the completion of at least two comparable construction projects within the last 5 years; evidence required, submitted as self-declaration. EK 3 (Nachweise, standard participation-conditions form): confirmation of social insurance contributions and tax compliance; information on financial stability; compliance with occupational health and safety rules and working conditions; for sectors with a collective labour agreement (GAV), a certificate from ISAB or the joint professional commission confirming GAV compliance; gender pay equality self-declaration and, for firms with more than 100 employees, the result of the pay equality analysis under Art. 13a GlG and either the independent body's report (Art. 13d GlG) or the state control confirmation (Art. 13b GlG exemption); sustainability certificates such as ISO 14001 or equivalent. Evidence must be provided. Bidding consortia are not permitted. Subcontractors are permitted.

How bids are scored

Award is based on four criteria: - ZK 1 Quality (35%): equivalence or superiority of proposed products relative to the specifications in the bill of quantities (Leistungsverzeichnis), and evidence of schedule adherence or earlier completion through additional resources. - ZK 2 Reference (30%): at least three comparable completed projects within the last 5 years, with client assessments, plus education and experience of the key person. - ZK 3 Price (30%): total price for the tendered scope, including 8.1% VAT. - ZK 4 Sustainability (5%): a statement of no more than one A4 page on how the contract will be executed sustainably across social, economic and environmental dimensions. Price/quality split: 70% non-price (quality, references, sustainability) and 30% price.

Key requirements

  • Complete dismantling and new installation of HVAC control cabinets (GA), field devices and cabling
  • Installation of two 63A fuses in the low-voltage main distribution for new heat pumps
  • Modernisation of protective equipotential bonding and a new electrical group for garage ceiling radiant panels

Procurement contact

The notice names a procurement contact for clarification questions.

CPV codes

How this compares

About this sector

Energy efficiency funding covers building retrofits, industrial process upgrades, heat recovery, efficient equipment and demand reduction. It arrives as grants for audits and capital works, as support schemes run by agencies and utilities or as public tenders for retrofit and energy services. Applicants usually need a baseline of current energy use and a measured saving.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

Sourcesimap.ch (Switzerland)
Published9 Nov 2026
Closes30 Nov 2026, 23:59 UTC
Buyer typeGovernment
TypeWorks
DeliveryOn-site
CountrySwitzerland
RegionCH-SG
SubmissionElectronic only, via simap.ch (Online). The full offer must be submitted as a si
Last verified10 Nov 2026

Documents to prepare

Named in this notice. Check the official notice for the full list.

  • Self-declaration of sufficient personnel and financial resources (EK 1)
  • Self-declaration of references for completion of at least two comparable construction projects within the last 5 years…
  • Confirmation of social insurance contributions and tax compliance (EK 3)
  • Information on financial stability (EK 3)
  • Evidence of compliance with occupational health and safety rules and working conditions (EK 3)
  • Certificate from ISAB or the joint professional commission confirming GAV compliance, for sectors with a collective…
  • Gender pay equality self-declaration (EK 3)
  • Result of the pay equality analysis under Art. 13a GlG, for firms with more than 100 employees (EK 3)
  • Independent body's report (Art. 13d GlG) or state control confirmation (Art. 13b GlG exemption), for firms with more…
  • Sustainability certificates such as ISO 14001 or equivalent (EK 3)
  • At least three comparable completed projects within the last 5 years with client assessments (ZK 2)
  • Education and experience of the key person (ZK 2)