This tender closed on 22 May 2026. The deadline passed 187 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Powering Universal Lighting via Solar Energy (PULSE) 2026 Tender
- Value
- Not stated · check listing
- Closes
- 22 May 2026Closing date passed
- Where
- Worldwide
- Contract
- Consulting · Ngo
In context
This is a contract notice published by an NGO covering consulting. Bids are invited through an open procedure. Delivery covers any country. It is classified under Renewable Energy against the sustainability taxonomy rather than matched on keywords.
Summary
Gold Standard is seeking stakeholder feedback on the PULSE methodology for deploying solar-powered lighting systems in underserved communities, developed with d.light. Suitable bidders include solar energy companies, NGOs, social enterprises, and technical experts in off-grid renewable energy deployment and impact measurement.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
Gold Standard has opened a public consultation on the Powering Universal Lighting via Solar Energy (PULSE) methodology, a Paris Agreement Aligned (PAA) framework that replaces the legacy AMS-III.AR approach for off-grid solar lighting activities. The methodology is designed to ensure that off-grid solar lighting activities meet genuine Tier 1 energy access (study, work, safety) aligned with GS4GG PAA requirements, while supporting universal energy access (SDG 7). Key methodological innovations include: Bounded Suppressed Demand requiring devices to meet the World Bank Multi-Tier Framework (MTF) Tier 1 threshold of 1,000 lumen-hours/day, with a Service Level Ratio Cap (SLRcap) of 5.0 to prevent unbounded crediting; Mandatory Embodied Emissions Accounting requiring cradle-to-gate emissions deduction for batteries and PV modules; Digital MRV & 100% Census requiring Unique Identifier (UID) tracking of all devices in a centralized database (eliminating sampling for Ndist); Environmental Safeguards prohibiting toxic chemistries such as Nickel-Cadmium and mandating a Waste Management Plan (WMP) subject to retrospective audit at crediting renewal; and a Grid Transition Protocol requiring annual grid-extension checks with automatic switching to the national Grid Emission Factor where Reliable Grid (Tier 3+) status is achieved. Documents under consultation include the Paris Aligned PULSE methodology and a Supplementary Information Document. Gold Standard welcomes stakeholder feedback during the consultation period of 22 April 2026 to 22 May 2026.
Key requirements
- Expertise in solar energy systems and off-grid lighting solutions
- Understanding of impact measurement and carbon finance methodologies
- Stakeholder feedback on PULSE methodology design and applicability
Relevant sectors
How this compares
About this sector
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)