Skip to content
Raise Lens
Tender

Provincial flood risk management centre development works, Sidi Kacem, single lot 2026 Tender

Original: Travaux d’aménagement du centre provincial de gestion des risques d'inondations au niveau de la Province -Province de Sidi Kacem- lot unique.

GOUVERNEUR DE LA PROVINCE DE SIDI KACEM

Value
Not stated · check listing
Closes
10 Nov 2026
 
Where
Morocco
Contract
Works · Government

Free accounts: 1 official link a month · Pro: every link

In context

This is a contract notice published by a government body covering construction and works. Bids are invited through an open procedure. Delivery covers Morocco (MENA). It is classified under Climate Adaptation and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

This open single-lot tender procures construction and fit-out works to develop a provincial centre for flood risk management in Sidi Kacem, Morocco. It suits licensed Moroccan civil-works contractors with construction capacity and relevant qualifications, rather than software or consulting firms.

Summary by Raise Lens from the official notice · 1 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

Travaux d’aménagement du centre provincial de gestion des risques d'inondations au niveau de la Province -Province de Sidi Kacem- lot unique. Procédure : Appel d'offres ouvert Lieu d'exécution : Province de Sidi Kacem Référence : 30/2026/so3303up

Key requirements

  • Single-lot civil works for a provincial flood risk management centre
  • Open tender; bidders must meet Moroccan contractor qualification and registration requirements
  • Reference 30/2026/so3303up; closing date 10 November 2026

Relevant sectors

Adaptation tendersInfrastructure

How this compares

About this sector

Climate adaptation funding helps communities, infrastructure and businesses prepare for heat, flooding, drought and sea level rise. Most of it is public and multilateral money, often targeted at vulnerable regions and delivered with local government. Calls usually ask for a climate risk assessment and evidence that local people shaped the plan.