Skip to content
Raise Lens
Tender · TED (EU)

Railway infrastructure modernization Constanța Port Stage III design execution

Original: Railway construction works – Proiectare şi Execuție lucrări aferente obiectivului de investiţii „Modernizarea infrastructurii feroviare din Portul Constanța – Etapa III”.

Compania Nationala de Cai Ferate "CFR" - SA

Value
RON 3351M – RON 3960.7M
Closes
Not stated · check listing
Where
Romania
Contract
Works · Soe

Free accounts: 1 official link a month · Pro: every link

In context

This is a contract notice published by a state-owned enterprise covering construction and works. Delivery covers Romania and the European Union (Europe). It is classified under Climate Adaptation and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

Design and execution of railway infrastructure modernization works at Constanța Port (Stage III), including track upgrades, station construction, and intermodal connectivity on the TEN-T Rin-Danube Corridor. Bidders must be experienced railway construction and engineering firms capable of delivering complex transport infrastructure projects.

Summary by Raise Lens from the official notice · 19 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

Design and execution of railway infrastructure modernization works at Constanța Port – Stage III. The project includes modernization of railway lines that are part of the TEN-T network and the Rhine-Danube Corridor in Romania, connecting maritime routes to terrestrial railway networks. Works cover: Agigea South Station (including connection line between Agigea Lock and Agigea South), Line 813B (existing connection between Agigea Lock and Port Constanța Ferry Boat), Port Constanța Ferry Boat, and CMT Constanța outside the port zone. Expected implementation duration is 99 months total from project start order, comprising: 7 calendar months for design services (including PTE approval and Construction Authorization), 30 calendar months for execution works, 1 month for final reception, and minimum 60 months warranty period. The project aims to improve freight transport quality, accessibility, interoperability between transport modes, eliminate bottlenecks, and support modal shift toward rail transport.

Bidder eligibility

Bidders must comply with Government Decision HG 907/2016 regarding technical-economic documentation for public investment projects and Law 99/2016. Requirements include: legal registration and classification as railway construction contractor; technical and financial capacity to execute major infrastructure works; prior experience with complex railway modernization projects; compliance with TEN-T and EU railway interoperability standards; ability to coordinate signaling and electronic centralization installations; Romanian or EU-registered entity eligible to bid on public sector railway contracts.

Key requirements

  • Design and execution of railway modernization works at Constanța Port (Stages III)
  • Upgrade of Agigea Sud station, Line 813B, Ferry Boat terminal, and CMT Constanța connection
  • Compliance with TEN-T Rin-Danube Corridor standards and interoperability requirements
  • Integration of multimodal transport connectivity between maritime and rail networks
  • Safety, security, and efficiency improvements to port rail infrastructure

CPV codes

Relevant sectors

Adaptation tendersInfrastructure

How this compares

About this sector

Climate adaptation funding helps communities, infrastructure and businesses prepare for heat, flooding, drought and sea level rise. Most of it is public and multilateral money, often targeted at vulnerable regions and delivered with local government. Calls usually ask for a climate risk assessment and evidence that local people shaped the plan.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceTED (EU)
Published20 Jul 2026
Buyer typeSoe
TypeWorks
DeliveryOn-site
CountryRomania
RegionEurope
CurrencyRON
Budget rangeRON 3351M – RON 3960.7M
Last verified19 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)