Railway works – Participation request IR267558 Kirkkonummi track-change point construction
Original: Railway construction works – Osallistumispyyntö IR267558 Kirkkonummen raiteenvaihtopaikan rakentaminen
Väylävirasto
- Value
- Not stated · check listing
- Closes
- 7 Dec 2026
- Where
- Finland
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
Pro early accessIn public feeds and alerts from 28 Nov. This page is open to everyone now.
In context
This is a contract notice published by a government body covering construction and works. Bids are invited through a restricted procedure. Delivery covers Finland (Europe). It is classified under Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
Väylävirasto is procuring a lump-sum turnkey contract to build a new track-change connection at Kirkkonummi station, including electrification and signalling works, to support more frequent commuter rail services. Suited to established rail infrastructure contractors with electrification and signalling capability, not small sustainability startups.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Väylävirasto (Finnish Transport Infrastructure Agency) is procuring a railway construction contract under request for participation IR267558 for building a new track-switching connection (raiteenvaihtopaikka) at the Kirkkonummi railway station. The project aims to improve commuter train operations at Kirkkonummi. At present, the eastern end of the station lacks a switch connection from the northern track to the southern main track. As a result, commuter trains on tracks two and three must cross to the southern track at Heikkilä track-switching point, over two kilometres east of Kirkkonummi. Improving these connections is intended to support current traffic flow and the future development of commuter rail between Kirkkonummi and Helsinki. Together with completion of the Espoo city railway, it would enable a 15-minute commuter train frequency. The contract covers construction of the new Kirkkonummi switch connection, including overhead line (electrification) works and signalling works, carried out according to the design plans. It is a lump-sum (kokonaishintainen) comprehensive contract. Detailed scope is set out in the tender documents. The contract duration is not stated on the notice page.
Key requirements
- Lump-sum turnkey contract (kokonaishintainen kokonaisurakka) for the full scope
- Build new track-change connection from north to south main track at Kirkkonummi station
- Include overhead line (electrification) and signalling works per design documents
CPV codes
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Climate-related engineering and infrastructure covers water and wastewater systems, flood defences, transport and rail, electricity networks and environmental studies. Almost all of it is public procurement for design, studies and works, often under framework agreements. Bidders are usually assessed on technical capacity, professional accreditation and delivery of comparable schemes.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)