Rechargers – Procurement of AC charging stations 2026 Tender
Original: Rechargers – Beschaffung von AC-Ladestationen
Berliner Stadtwerke KommunalPartner GmbH
- Value
- Not stated · check listing
- Closes
- 18 Dec 2026
- Where
- Germany
- Contract
- Supplies · Utility
Free accounts: 1 official link a month · Pro: every link
Pro early accessIn public feeds and alerts from 28 Nov. This page is open to everyone now.
In context
This is a contract notice published by a utility covering the supply of goods. Bids are invited through a framework agreement. Delivery covers Germany (Europe). It is classified under Electric Mobility against the sustainability taxonomy rather than matched on keywords.
Summary
A Berlin municipal utility subsidiary is procuring AC charging stations for electric vehicles under Lot 1, using a framework agreement with up to two suppliers ranked by award criteria. It suits electric-mobility hardware suppliers, particularly those able to deliver and maintain AC charging equipment in Germany.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Only Lot 1 is described in the available information. It will be let as a framework arrangement, with up to two suppliers placed in ranking order according to the award criteria. Individual call-offs under the arrangement are directed first to the highest-ranked supplier, and pass to the next-ranked supplier should the first be unable to carry out the requested work or should it decline the order. The buyer is a utility-sector body based in Germany, a municipal utility subsidiary of Berlin. The contract type is supplies. The notice was published on 20 November 2026 and closes on 18 December 2026.
Full description from the source
The procurement concerns the supply of AC charging stations (German title: "Rechargers – Beschaffung von AC-Ladestationen"), issued by Berliner Stadtwerke KommunalPartner GmbH, a utility buyer. The notice is split into lots, and the excerpt available covers Lot 1, which is procured via a framework agreement (Rahmenvereinbarung) with up to two economic operators. The page excerpt does not state the quantities, technical specifications, delivery locations, or the contract duration. Those details are presumably in the full tender documents, which were not included in the page text. Under the framework structure, individual call-offs (Einzelabrufe) are placed with the first-ranked contractor. If that contractor cannot perform the requested service in accordance with the contract, or declines the call-off, the call-off passes to the next-ranked contractor. Further details are to be set out in the framework contract itself.
How bids are scored
Bids are ranked according to the award criteria (Zuschlagskriterien). The page does not disclose the individual criteria, any price/quality split, or their weightings.
Lots
- Lot 1: Los 1 (title not stated in the page excerpt; relates to AC charging stations)
Framework agreement with up to two economic operators. Call-offs go first to the highest-ranked bidder, with fallback to the next-ranked bidder if the first cannot perform or declines the call-off.
Key requirements
- Lot 1 framework agreement with up to two economic operators, ranked by award criteria
- Individual call-offs go to the top-ranked supplier, with fallback to the next-ranked supplier
- Supply of AC charging stations for electric vehicles, per the framework contract terms
CPV codes
CPV codes
Relevant sectors
How this compares
How this compares
- Compared with 658 similar tenders (e-mobility in Germany) listed in the last 12 months.
- Similar tenders that state a value range from $37k to $169m, with a median of $1.2m (44 tenders).
- It allows 28 days to respond, shorter than the typical 30 days across 376 similar tenders.
- The same organisation listed 2 other similar tenders here in the last 12 months.
Closest open tenders
Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.
About this sector
About this sector
Electric mobility funding supports electric vehicles, charging infrastructure, battery supply chains and fleet transition for buses, vans and trucks. Public authorities buy vehicles and charge points through tenders, while grants back pilots and manufacturing. Applicants usually need site plans, grid capacity checks and an operator for the finished assets.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in framework agreements; typical only, not this buyer’s list. Check the official notice.
- Selection questionnaire or qualification form
- Company registration certificate
- Audited financial statements
- Insurance certificates
- Case studies or references for similar work
- Quality, health and safety, and environmental policies