Reconstruction of bridge over Timișul Sec stream and rail triage lines
Original: Road bridge construction work – Proiectare si Execuție Lucrări pentru obiectivul de investiție “RECONSTRUIRE POD PESTE PÂRÂUL TIMIȘUL SEC ȘI GRUPUL DE LINII CF TRIAJ PE STR. TIMIȘUL SEC, MUNICIPIUL BRAȘOV”
MUNICIPIUL BRASOV
- Value
- Not stated · check listing
- Closes
- 7 Dec 2026
- Where
- Romania
- Contract
- Mixed · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering a mix of works, supplies and services. Delivery covers Romania and the European Union (Europe). It is classified under Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
A Brașov municipality design-and-build contract to reconstruct a road bridge over the Timișul Sec stream and a railway triage track group, with 3 months of design, 20 months of works, and designer technical assistance during execution. Suited to bridge contractors with design capability and rail-proximity experience, likely as a prime or in a consortium with a designer.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The contract covers design services, designer technical assistance during construction, and execution of works for the investment objective "RECONSTRUIRE POD PESTE PÂRÂUL TIMIȘUL SEC ȘI GRUPUL DE LINII CF TRIAJ PE STR. TIMIȘUL SEC, MUNICIPIUL BRAȘOV" (reconstruction of the bridge over the Timișul Sec stream and the Triaj railway lines on Timișul Sec Street, Brașov). The works are to follow the technical solution approved in the Documentația de Avizare a Lucrărilor de Intervenții (DALI). Timișul Sec Street links Strada Hărmanului (DN11) with Strada Zizinului (DJ103A). It serves access to the industrial area and regional road traffic. The project aims to restore continuity of traffic on the street, ensure safe road and pedestrian traffic, secure railway safety beneath the bridge, and provide adequate drainage for the Timișul Sec stream. Contract duration: 3 months for design activities, followed by 20 months for construction works. Designer technical assistance is provided throughout the execution period. Detailed technical requirements and performance conditions are set out in the Caietul de sarcini (specifications) and the associated technical documentation for the investment.
Key requirements
- Design (DALI-based technical solution) within 3 months, followed by execution works
- Bridge reconstruction over stream and railway group to ensure rail safety and proper water drainage
- Designer technical assistance during the 20-month execution period
Relevant sectors
How this compares
About this sector
About this sector
Climate-related engineering and infrastructure covers water and wastewater systems, flood defences, transport and rail, electricity networks and environmental studies. Almost all of it is public procurement for design, studies and works, often under framework agreements. Bidders are usually assessed on technical capacity, professional accreditation and delivery of comparable schemes.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)