This tender closed on 12 August 2026. The deadline passed 106 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Refrigerating equipment – cooling system modernization via dry cooler replacement
Original: Refrigerating equipment – Modernizacja układu chłodzenia wytwornicy chłodu lewego toru chłodzenia w BST poprzez wymianę chłodnicy wentylatorowej (drycoolera).
Instytut Chemii Bioorganicznej Polskiej Akademii Nauk, Poznańskie Centrum Superkomputerowo-Sieciowe
- Value
- Not stated · check listing
- Closes
- 12 Aug 2026Closing date passed
- Where
- Poland
- Contract
- Supplies · Government
In context
This is a contract notice published by a government body covering the supply of goods. Delivery covers Poland (Europe). It is classified under Heating and Cooling and Energy Efficiency against the sustainability taxonomy rather than matched on keywords.
Summary
Modernization of a cooling system at a Polish research institute through replacement of a fan cooler (dry cooler) unit, including installation, documentation, 5-year warranty service, and staff training. Bidders should be HVAC/refrigeration equipment suppliers or specialized cooling-system integrators with installation and warranty-service capacity.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
Modernization of the cooling system of the left cooling line ice production unit (BST) through replacement of a fan cooler (drycooler). The scope includes: preparation of equipment installation design, dismantling of existing installation, preparation of post-completion documentation, warranty inspections over 5 years, staff training for designated personnel, and provision of operation manuals and accompanying software. The supplied equipment must be factory new, technically sound, complete, and free from defects. Delivery includes installation documentation in paper (2 copies) and electronic formats with catalog cards and installation/operation instructions. All supplied equipment must comply with RoHS directive.
Bidder eligibility
Bidders must conduct a mandatory site visit before bid submission to familiarize themselves with site-specific conditions. The site visit must be scheduled with Rafał Mikołajczak (tel: +48 693 91 00 22, email: Rafal.Mikolajczak@man.poznan.pl) during working hours (Monday-Friday, 09:00-15:00, excluding public holidays). Attendance at the site visit is mandatory; failure to participate will result in bid rejection under Article 226(1)(18) of the Public Procurement Law. Equipment must originate from manufacturer distribution channels serving the Polish market and ensuring warranty claim fulfillment. Bidders must comply with on-site regulations.
Key requirements
- Factory-new, unused dry cooler (drycooler) unit, technically sound and free of defects
- Installation design, dismantling of existing equipment, post-execution documentation, and 5-year warranty inspections
- Staff training and instruction for designated personnel on equipment operation
- Operating manuals, accompanying software/licenses, and warranty support via authorized Polish distributor channel
Procurement contact
The notice names a procurement contact for clarification questions.
Relevant sectors
How this compares
About this sector
About this sector
Heating and cooling funding supports heat pumps, district heating, thermal networks, efficient cooling and the removal of fossil boilers. It arrives through national support schemes, local authority programmes and procurement for heat networks. Applicants typically need heat demand assessments, a connection plan and an operator for the system.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)