Reinforced concrete foundation and elevated base for 50,000-litre drinking water reservoir 2026 Tender
Original: Contratação de empresa especializada para execução de fundação e base elevada em concreto armado para instalação de reservatório de água potável com capacidade de 50.000 litros, no Distrito de Taquaral, incluindo deslocamento e fixação do reservatório existente, fornecimento de materiais, equipamentos, mão de obra, transporte e elaboração de projeto as built.
SERVICO AUTONOMO DE AGUA E ESGOTO
In context
This is a contract notice published by a government body covering construction and works. Delivery covers Brazil (LatAm). It is classified under Water and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
This tender procures design, construction, and installation of a reinforced concrete elevated foundation and base for a 50,000-liter potable water reservoir in rural Brazil, including project documentation. Specialized civil engineering and water-infrastructure contractors with experience in elevated water-tank construction and as-built documentation are the target bidders.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The buyer, Serviço Autônomo de Água e Esgoto, is procuring a specialized contractor to build a reinforced concrete foundation and elevated base for a potable water reservoir with a 50,000-litre capacity in the Distrito de Taquaral. The scope includes relocating and fixing the existing reservoir, and supplying materials, equipment, labour, and transport. The deliverables also include preparing an as-built project (projeto as built) documenting the completed works. The page provides only the object description; technical specifications, quantities, and the execution period are not stated. The expected duration is not disclosed.
Key requirements
- ✓Design and construction of reinforced concrete elevated foundation and base for 50,000-liter potable water reservoir
- ✓Relocation and fixation of existing reservoir
- ✓Supply of materials, equipment, labour, and transport
- ✓Elaboration of as-built project documentation
Relevant sectors
About this sector
Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.
Free accounts: 1 official link a month · Pro: every link
Quick facts
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →