Renovation of irrigation network to eliminate losses, Castelluccio Favarotta, second stage
Original: Construction work for water projects – Lavori di Ristrutturazione della rete irrigua dipendente dal complesso irriguo Dittaino-Ogliastro per l'eliminazione delle perdite ed il recupero della risorsa idrica. Territorio Castelluccio Favarotta. II Stralcio
Consorzio di Bonifica 7 Caltagirone
- Value
- Not stated · check listing
- Closes
- 10 Dec 2026
- Where
- Italy
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
Pro early accessIn public feeds and alerts from 26 Nov. This page is open to everyone now.
In context
This is a contract notice published by a government body covering construction and works. Delivery covers Italy (Europe). It is classified under Water and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
This Italian works tender funds the second stage of rehabilitating an irrigation distribution network in Castelluccio Favarotta, focused on cutting water losses by upgrading pressure and flow regulation lines and rebuilding control posts and metering equipment. It suits SME construction and hydraulic engineering contractors with irrigation infrastructure experience in Sicily.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The procurement covers the second stage (II Stralcio) of works to restructure the irrigation network that depends on the Dittaino-Ogliastro irrigation complex, in the Castelluccio Favarotta territory. The stated aim is to eliminate leaks and recover water resources. The works, in summary, include: strengthening the three existing pressure and flow reduction and regulation lines on the primary network at the Ogliastro and Margherito towers, and rebuilding the 'postazioni comiziali' (outlet posts) and related sub-outlets, together with control and measurement equipment. The page refers to the detailed documents of the Executive Project for full specifications. Contract duration and deliverable timelines are not stated in the available text.
Key requirements
- Upgrade three existing pressure and flow reduction and regulation lines on primary network at Ogliastro and Margherito
- Rebuild commissioning stations, sub-stations and control and measurement equipment
- Hydraulic and irrigation construction experience; Italian public works qualifications expected
CPV codes
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)