Repair and modification of ventilation units 55 and 56 for barrier breeding
Original: Repair and maintenance services – Oprava a modifikace stávajícího VZT zařízení 55 a 56 pro větrání bariérových chovů ve zvěřinci zadavatele
Ústav molekulární genetiky AV ČR, v. v. i.
- Value
- Not stated · check listing
- Closes
- 10 Dec 2026
- Where
- Czech Republic
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering construction and works. Delivery covers Czechia (Europe). It is classified under Heating and Cooling against the sustainability taxonomy rather than matched on keywords.
Summary
A Czech public research institute is seeking a contractor to dismantle, clean, reassemble and reconnect two ventilation units (55 and 56) serving barrier animal rooms, with new ducting fittings and phased works that must avoid disrupting the building or contaminating animals. It suits a mechanical or HVAC contractor able to deliver on-site repair work under strict operational constraints.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The buyer, the Institute of Molecular Genetics of the Czech Academy of Sciences (Ústav molekulární genetiky AV ČR, v. v. i.), is procuring repair and modification works under a works contract on ventilation (HVAC) units No. 55 and No. 56. These units ventilate the barrier animal rooms in the Fb pavilion, which houses the buyer's animal facility. The works include dismantling the existing units into components, reassembling the individual chambers in a new order, and thoroughly cleaning the internal and external surfaces of the chambers before reinstallation. The units must be reconnected to the existing ventilation ductwork, and new duct fittings must be fabricated or existing ones adapted. The contractor must also supply all assembly and consumable materials, and may need to replace or supplement small sections of piping, cables, threaded rods, bolts, flexible mountings and similar items. The contractor must set its own work procedure in line with the works schedule (Annex No. 3 to the tender documentation). The expected sequence is: relocate animals ventilated by unit 55; modify the bypass between units 55 and 56; fully repair and recommission unit 55; relocate animals from the areas ventilated by unit 56; modify the bypass; fully repair and recommission unit 56; carry out complete testing after installation, including all dependent trades; and hand over the completed works. Works must not endanger the operation of the Fb building, in particular through interruptions to hot and cold water, drinking water or electricity supply, and must not contaminate the laboratory animals. The detailed scope is set out in Annex No. 2 (Technical Report with attachments) and Annex No. 1 (itemised bill of quantities). The contract duration is not stated on the page.
Key requirements
- Dismantle, clean, reassemble and reconnect ventilation units 55 and 56 with a phased schedule
- Keep building utilities running and prevent contamination of laboratory animal facilities during works
- Supply all installation and consumable materials, including custom ducting fittings and replacement small components
Relevant sectors
How this compares
About this sector
About this sector
Heating and cooling funding supports heat pumps, district heating, thermal networks, efficient cooling and the removal of fossil boilers. It arrives through national support schemes, local authority programmes and procurement for heat networks. Applicants typically need heat demand assessments, a connection plan and an operator for the system.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)