Skip to content
Raise Lens
Tender · CanadaBuysClosed

Agriculture and Irrigation - Request for Proposal - Condition Assessment and Hydraulic Study from Ben’s Lake Structure to Lake 6 Outlet

Agriculture and Irrigation

Value
Not stated · check listing
Closes
15 Oct 2026Closing date passed
Where
Canada
Contract
Consulting · Government

In context

This is a contract notice published by a government body covering consulting. Delivery covers Canada (NORTH-AMERICA). It is classified under Water and Climate Adaptation against the sustainability taxonomy rather than matched on keywords.

Summary

This tender procures a comprehensive condition assessment and hydraulic study of a river reach to evaluate vegetation/sediment impacts on water conveyance capacity and identify remediation measures. Bidders should have expertise in hydraulic engineering, river/watershed assessment, and environmental/water infrastructure analysis.

Summary by Raise Lens from the official notice · 14 Oct 2026Accurate?

This tender has closed

Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.

About this tender

The Agriculture and Irrigation department requires a comprehensive condition assessment and hydraulic study of the Vermilion River reach extending from Ben's Lake Diversion Structure to downstream of Lake Six outlet (approximately 5 km). The waterbody has become significantly constricted by dense aquatic and emergent vegetation, particularly cattails, which may have reduced hydraulic conveyance capacity. The scope includes visual condition assessment of both constructed and naturally occurring channel sections, identification of hydraulic constraints, evaluation of vegetation and sediment accumulation impacts on flow capacity, hydraulic analysis to assess channel performance, identification of priority cleanout locations, and recommendations for remediation measures to optimize channel conveyance capacity and improve flow conveyance while assessing impacts on upstream water levels and flood risk.

Key requirements

  • Visual condition assessment of river reach from Ben's Lake Diversion Structure to Lake Six outlet
  • Hydraulic analysis to evaluate conveyance capacity and impacts of vegetation/sediment accumulation
  • Identification of channel constrictions, cleanout priorities, and remediation recommendations
  • Assessment of both constructed and naturally occurring channel sections
  • Evaluation of upstream water level and flood risk impacts

Procurement contact

The notice names a procurement contact for clarification questions.

How this compares

About this sector

Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.

This opportunity has closed. Find the next one

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Alert me to similar opportunities →

Quick facts

SourceCanadaBuys
Published25 Sep 2026
Closes15 Oct 2026, 14:00 UTC
Buyer typeGovernment
TypeConsulting
DeliveryOn-site, Hybrid
CountryCanada
RegionNORTH-AMERICA
SubmissionFull details available on third-party site; competitive open bidding process wit
Last verified14 Oct 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)