City of Calgary - Request for Proposal - RFP 26-1778 MAX Purple East Extension Detailed Design
City of Calgary
- Value
- Not stated · check listing
- Closes
- 15 Dec 2026
- Where
- Canada
- Contract
- Consulting · Government
Free accounts: 1 official link a month · Pro: every link
Pro early accessIn public feeds and alerts from 27 Nov. This page is open to everyone now.
In context
This is a contract notice published by a government body covering consulting. Delivery covers Canada (NORTH-AMERICA). It is classified under Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
The City of Calgary is procuring detailed engineering and architectural design services for the MAX Purple East Extension, a bus rapid transit corridor with bus-only lanes, a turnaround, and queue jumps along 17 Avenue SE. It suits an engineering-led multi-disciplinary consultancy with transit design experience rather than a small startup.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The City is seeking the services of a qualified multi-disciplinary team, led by an engineering firm, to provide engineering and architectural services for the MAX Purple East Extension. The design work to extend the MAX Purple/17 Avenue East Bus Rapid Transit (BRT) project is comprised of bus only lanes, bus turnaround, queue jumps, and mobility improvements, among others, that will directly improve the customer experience in all categories (travel time, reliability, comfort, and convenience). This investment will provide improved primary transit network access for the communities of Red Carpet and Applewood Park, while adding the infrastructure necessary for the community of Belvedere to continue growing. The MAX Purple East Extension project will ultimately extend the MAX Purple along 17 Ave SE from Hubalta Rd SE to The City of Chestermere. It is envisioned to take place over three major stages listed below: Stage 1: Hubalta Rd SE to 70 ST SE including a Bus turnaround between 100 and 104 ST SE • Phase 0: Update the current preliminary design drawings in the MAX Purple East Extension Functional Planning Study (Max Purple FPS) provided in Appendix F.A.2.1 such that: i) Eastbound: transition from the dedicated BRT lanes to on-street BRT east of 70 St SE, continue in mixed traffic, and transition back into the dedicated BRT lanes at 100 St SE to access the turnaround; and ii) Westbound: transition from the dedicated BRT lanes at the turnaround at 100 St SE to on-street BRT operation, continue in mixed traffic, and transition back into the dedicated BRT lanes at 70 St SE. • Phase 1: Detailed Design • Phase 2: Construction Contract Administration Services (currently unfunded) • Phase 3: Post-Construction Contract Administration Services (currently unfunded) Stage 2: 104 St NE to 116 ST NE (currently unfunded), including any potential upgrades in the transportation utility corridor (TUC). Stage 3: Service between Calgary (116 ST NE) and the city of Chestermere (currently unfunded). The initial award under this RFP is for Stage 1, Phases 0 and 1 only. The award of subsequent stages is contingent upon the Consultant's performance, availability of additional budget, and necessary approvals.
Key requirements
- Multi-disciplinary team led by an engineering firm, including architectural services
- Phase 0 update of the MAX Purple East Extension Functional Planning Study preliminary design
- Phase 1 detailed design for Stage 1 (Hubalta Rd SE to 70 St SE, including a bus turnaround between 100 and 104 St SE)
- Construction contract administration phases are currently unfunded and may not be included
- Transit infrastructure design: bus-only lanes, queue jumps, and mobility improvements
Relevant sectors
How this compares
About this sector
About this sector
Climate-related engineering and infrastructure covers water and wastewater systems, flood defences, transport and rail, electricity networks and environmental studies. Almost all of it is public procurement for design, studies and works, often under framework agreements. Bidders are usually assessed on technical capacity, professional accreditation and delivery of comparable schemes.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)