Reservoir construction – Elevated basin – Pipeline route Smååsane-Støleheia
Original: Reservoir construction works – Elevated basin - Rørtrasé Smååsane-Støleheia
Vennesla kommune
- Value
- Not stated · check listing
- Closes
- 14 Dec 2026
- Where
- Norway
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering construction and works. Delivery covers Norway (Europe). It is classified under Water and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
Vennesla kommune seeks a turnkey contractor to design and build a new 1,500 m³ elevated water reservoir with stairways and a valve house, working from a site the main contractor has prepared. The work suits an established civil-engineering contractor with water infrastructure experience, not a small sustainability startup.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The contract covers engineering design and construction of a new elevated water basin with a capacity of 1,500 m³, together with accompanying stairways and a valve house. It is procured as a turnkey arrangement in which the main contractor hands over the completed site, which must be blasted, unloaded, fulfilled and rough-graded (grovplanert). The turnkey contractor carries out the ground and foundation works on the prepared, rough-graded site for the basin, stairwell and valve house. The main contractor is also responsible for developing and asphalting the surrounding areas. The page does not state the contract duration or delivery milestones.
Key requirements
- Engineering design and construction of a 1,500 m³ elevated water basin with stairways and valve house
- Turnkey ground and foundation works from a site prepared by the main contractor
- Handover of a completed, blasted, unloaded and graded site as required for the basin works
Relevant sectors
How this compares
About this sector
About this sector
Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)