RfS for 1200 MW ISTS-Connected Wind Power Projects in India (SECI-Tranche-XXI)
Solar Energy Corporation of India Limited (SECI)
- Value
- Not stated · check listing
- Closes
- 24 Nov 2026
- Where
- India
- Contract
- Mixed · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering a mix of works, supplies and services. Bids are invited through competitive dialogue. Delivery covers India (Asia). It is classified under Renewable Energy against the sustainability taxonomy rather than matched on keywords.
Summary
SECI is procuring 1200 MW of ISTS-connected wind power capacity, likely via a build-own-operate or power purchase model under a Request for Selection. Bidders suited are large renewable developers and IPPs with financial strength and wind project delivery track record, as the scale and bid security requirements exclude most startups.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Solar Energy Corporation of India Limited (SECI) has issued a Request for Selection (RfS) for 1200 MW of ISTS-connected wind power projects in India, under SECI-Tranche-XXI (Tender Reference SECI/C&P/IPP/12/0011/26-27). The tender is published on the SECI portal and the Ethernet tender system (ETS Tender ID SECI-2026-TN000034), and is also listed on CPPP under the same reference. Tender documents include the RfS for 1200 MW Wind Tranche-XXI, a standard Power Purchase Agreement (PPA), a standard Power Sale Agreement (PSA), an Integrity Pact, and a clarifications format. Amendment-01 to the tender documents was uploaded on 28/10/2026. A pre-bid meeting was scheduled for 14/10/2026 and was subsequently rescheduled, with the rescheduling notice issued on 13/10/2026. The detailed scope, deliverables and contract duration are contained in the RfS document, which is not reproduced on this page.
How bids are scored
Tender type is stated as online with e-reverse auction. Specific price/quality split, scoring weightings and evaluation methodology are not disclosed on this page and are referenced to the RfS document.
Key requirements
- Development of 1200 MW wind power projects connected to the inter-state transmission system (ISTS)
- Bidders must meet SECI's financial qualification, net worth and bid security requirements under the RfS
- Projects must be commissioned within the timelines specified in the RfS, with power sold under SECI's contract framework
Procurement contact
The notice names a procurement contact for clarification questions.
Relevant sectors
How this compares
About this sector
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)