Skip to content
Raise Lens
TENDER · austria-ogdgovernmentservices

Runoff Investigation and Hazard Zone Planning Melk, Mank 2026 Tender

Original: ABU und GZP Melk, Mank

Land Niederösterreich, p.A. Amt der NÖ-Landesregierung

In context

This is a contract notice published by a government body covering services. Delivery covers Austria and the European Union (Lower Austria). It is classified under Climate Adaptation, Water and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

This tender procures flood-risk assessment and hazard-zone planning studies for four Austrian river systems (Melk, Mank, Zettelbach, Schlattenbachbach). Bidders should be engineering consultancies or hydrological specialists with expertise in flood modelling, risk assessment, and spatial planning.

Summary by Raise Lens from the official notice · 20 Oct 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

Abflussuntersuchung und Gefahrenzonenplanung Melk, Mank, Zettelbach und SchlattenbachLeistungsbeschreibung gemäß Ausschreibungsunterlagen

Key requirements

  • ✓Flood discharge investigation (Abflussuntersuchung) for four river systems
  • ✓Hazard zone planning (Gefahrenzonenplanung) and risk mapping
  • ✓Hydrological and hydraulic modelling expertise
  • ✓Deliverables per tender specifications (Leistungsbeschreibung)

Relevant sectors

About this sector

Climate adaptation funding helps communities, infrastructure and businesses prepare for heat, flooding, drought and sea level rise. Most of it is public and multilateral money, often targeted at vulnerable regions and delivered with local government. Calls usually ask for a climate risk assessment and evidence that local people shaped the plan.