Skip to content
Raise Lens
Tender · Austria OGD (data.gv.at)

S 8 Marchfeld Expressway West Section – Noise Study for Pending Appeal, EP Phase

Original: S 8 Marchfeld Schnellstraße Abschnitt West - KN S 1/S 8 bis ASt L9 - Lärmtechnische Untersuchung im anhängigen Beschwerdeverfahren in der Planungsphase EP

Autobahnen- und Schnellstraßen-Finanzierungs-Aktiengesellschaft

Value
Not stated · check listing
Closes
7 Dec 2026
 
Where
Austria
Contract
Services · Soe

Free accounts: 1 official link a month · Pro: every link

Raise Lens Pro

With Pro you could have had 39 days to prepare

See Raise Lens Pro
With Raise Lens Pro · seen 29 Oct 202639 days to prepare
Found today · 24 Nov 202613 days to prepare

In context

This is a contract notice published by a state-owned enterprise covering services. Delivery covers Austria (Lower Austria). It is classified under Sustainable Buildings and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

ASFINAG is procuring a noise impact study for the S 8 Marchfeld Expressway West section, supporting the pending appeal before the Federal Administrative Court during the Einreichprojekt planning phase. It suits environmental consultancies and acoustic engineering firms experienced with Austrian road-permit procedures.

Summary by Raise Lens from the official notice · 17 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The procurement concerns a noise study (Lärmtechnische Untersuchung) within the pending appeal proceedings before the Federal Administrative Court (BVwG, Bundesverwaltungsgericht) for the planning phase Einreichprojekt (EP) of the S 8 Marchfeld Schnellstraße, Section West, between the junction KN S 1/S 8 and ASt L9. The service consists of carrying out the noise investigation required as part of the BVwG appeal procedure during the Einreichprojekt planning phase. The stated performance target is completion of the phase's services with a legally binding project approval (rechtskräftige Projektgenehmigung) from the BVwG proceedings. The page provides no further detail on deliverables, volumes, or duration beyond this outcome-based target.

Key requirements

  • Carry out noise study supporting the pending BVwG appeal proceedings
  • Work within the Einreichprojekt (EP) planning phase of the S 8 Marchfeld expressway
  • Deliverable: legally binding project approval (rechtskräftige Projektgenehmigung)

CPV codes

Relevant sectors

Buildings tendersInfrastructure

How this compares

About this sector

Sustainable buildings funding covers low-energy new build, deep retrofit, building performance data and healthier indoor environments. Public owners procure design and works through tenders, while grants support innovation and community schemes. Bids are usually judged on measured performance, cost and delivery experience in occupied buildings.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceAustria OGD (data.gv.at)
Published12 Nov 2026
Closes7 Dec 2026
Buyer typeSoe
TypeServices
CountryAustria
RegionLower Austria
SubmissionElectronic submission via the provia.at bidder portal (Bieterportal), as indicat
Last verified17 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)