Skip to content
Raise Lens
Tender · Austria OGD (data.gv.at)

S3 EGSA Großstelzendorf–Hollabrunn construction works 2026 Tender

Original: S3 EGSA Großstelzendorf - Hollabrunn - Bauleistung

Autobahnen- und Schnellstraßen-Finanzierungs-Aktiengesellschaft

Value
Not stated · check listing
Closes
17 Dec 2026
 
Where
Austria
Contract
Works · Soe

Free accounts: 1 official link a month · Pro: every link

Pro early accessIn public feeds and alerts from 26 Nov. This page is open to everyone now.

Raise Lens Pro

With Pro you could have had 28 days to prepare

See Raise Lens Pro
With Raise Lens Pro · seen 19 Nov 202628 days to prepare
Found today · 24 Nov 202623 days to prepare

In context

This is a contract notice published by a state-owned enterprise covering construction and works. Delivery covers Austria (Lower Austria). It is classified under Water and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

ASFINAG is tendering construction works on the S3 expressway between Großstelzendorf and Hollabrunn, including a longitudinal drainage channel for road runoff, a water protection facility, and asphalt surface renewal. Established civil contractors with road and drainage experience fit best, and SMEs could bid for or subcontract the drainage and water-protection elements.

Summary by Raise Lens from the official notice · 23 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The procurement covers construction works on the S3 expressway section EGSA Großstelzendorf – Hollabrunn in Austria. Scope includes building a longitudinal channel to drain road runoff from the S3, constructing a water protection facility (Gewässerschutzanlage), and renewing the asphalt wearing course across the project area. Smaller works also in scope include trench discharge connections (Grabenausleitungen) and other minor construction measures. Duration and detailed deliverables are not stated on the page.

Key requirements

  • Construction of a longitudinal channel to drain S3 road water
  • Construction of a water protection (Gewässerschutz) facility
  • Renewal of asphalt surface layer and ditch diversions in project area

CPV codes

Relevant sectors

Water tendersInfrastructure

How this compares

About this sector

Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceAustria OGD (data.gv.at)
Published18 Nov 2026
Closes17 Dec 2026
Buyer typeSoe
TypeWorks
DeliveryOn-site
CountryAustria
RegionLower Austria
SubmissionElectronic submission via the provia.at Bieterportal (per listing URL)
Last verified23 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)

Related tenders