Scientific-technical consulting for road tunnel under Oder, S6 Szczecin bypass
Original: Consultative engineering and construction services – Doradztwo naukowo – techniczne dotyczące realizacji tunelu drogowego pod Odrą wraz z infrastrukturą towarzyszącą w ramach zadania „S6 Zachodnie Drogowe Obejście Szczecina. Odcinek 3 Police – Goleniów (od km 27+403 do km 50+810,20).”
Generalna Dyrekcja Dróg Krajowych i Autostrad
- Value
- PLN 605K – PLN 42.3M
- Closes
- 10 Dec 2026
- Where
- Poland
- Contract
- Consulting · Government
Free accounts: 1 official link a month · Pro: every link
Pro early accessIn public feeds and alerts from 25 Nov. This page is open to everyone now.
In context
This is a contract notice published by a government body covering consulting. Delivery covers Poland (Europe). It is classified under Sustainable Buildings against the sustainability taxonomy rather than matched on keywords.
Summary
The GDDKiA is procuring scientific and technical supervision consulting for design verification, tunnelling oversight, TBM parameter analysis, monitoring programmes and dispute assessment for a road tunnel under the Oder river as part of the S6 Szczecin western bypass. It suits experienced tunnel engineering consultancies with geotechnical, mining-law and tunnel safety expertise, not early-stage sustainability firms.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The procurement covers scientific and technical consultancy (scientific supervision, "nadzór naukowy") for the design and construction of a road tunnel under the Oder river, with associated infrastructure, as part of the S6 Western Szczecin Bypass, Section 3 Police–Goleniów (km 27+403 to km 50+810.20), commissioned by the Polish General Directorate for National Roads and Motorways (GDDKiA). The consultant's deliverables include: verifying the contractor's executive/technological/technical design solutions for legal, contractual and technical soundness, including the mining operation plan and rescue action plan, concluding with a scientific supervision statement; issuing scientific supervision opinions on technological and structural issues arising during design and construction, covering tunnel boring, tunnel lining, cross passages, diaphragm walls, materials, and author supervision cards; verifying tunnel equipment, infrastructure, the Tunnel Safety Documentation, and construction-phase works, including calculations, analyses and simulations; reviewing monitoring programmes and systems for the preparatory, boring and operational phases; and analysing TBM operating parameters during excavation, concluding with a scientific supervision statement. The consultant is also required to assess problems arising from contractor claims, change proposals or change orders, site failures, and the impact of third-party investments above the tunnel, concluding with an expert opinion ("Ekspertyza"). Under the scope, the Main Scientific Supervision Expert for the Tunnel, or designated members of the scientific expert team, must participate in working meetings, Site Councils and Technical Councils during design and construction. Meetings may take place at the Engineer's office, the contractor's office, the construction site, the GDDKiA Szczecin branch, administrative bodies, or by video conference. The buyer states that key tasks are not reserved for personal performance by the contractor. The contract duration is not stated on the page.
Key requirements
- Scientific supervision of tunnel design verification, TBM drilling parameters and tunnel lining technology
- Monitoring programme review and safety documentation assessment for the Oder road tunnel
- Expert opinions on contractor claims, change orders and construction incidents under S6 Szczecin Section 3
Relevant sectors
How this compares
About this sector
About this sector
Sustainable buildings funding covers low-energy new build, deep retrofit, building performance data and healthier indoor environments. Public owners procure design and works through tenders, while grants support innovation and community schemes. Bids are usually judged on measured performance, cost and delivery experience in occupied buildings.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)