Seetal WWTP, Tender for General Planner Services, SIA Phases 32–53
Abwasserverband Region Lenzburg (AVRL)
- Value
- Not stated · check listing
- Closes
- 15 Jan 2027
- Where
- Switzerland
- Contract
- Services · Government
Free accounts: 1 official link a month · Pro: every link
Pro early accessIn public feeds and alerts from 1 Dec. This page is open to everyone now.
In context
This is a contract notice published by a government body covering services. Delivery covers Switzerland (CH-AG). It is classified under Water, Ocean and Blue Economy and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
Swiss regional wastewater association AVRL is procuring general planner services (SIA phases 32, 33, 41, 51–53) to expand the Langmatt WWTP to 260,000 PE and add a micropollutant removal stage for 330,000 PE. Suited to established Swiss engineering firms with large wastewater treatment planning track records, not early-stage startups.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The Abwasserverband Region Lenzburg (AVRL) is procuring general planner (Generalplaner) services for the expansion of the Seetal wastewater treatment plant (ARA Seetal) at Langmatt, 5103 Wildegg AG, Switzerland. The project covers the planning and realisation of a new central wastewater treatment plant that will replace several existing regional facilities and serve the whole catchment area. The existing ARA Langmatt (about 100,000 population equivalents) is to be expanded mechanically and biologically to 260,000 PE. An EMV stage, designed for 330,000 PE, is also to be built to treat treated wastewater from ARA Wohlen and Chlostermatte. The general planner will handle the expansion including the EMV stage under SIA service phases 32, 33, 41 and 51–53, as set out in Form A3 (service description and fee schedule). Contract execution runs from 04.04.2027 to 29.06.2037, within a total contract duration of 31.03.2027 to 30.12.2037. The contract may not be extended. Tender documentation is in German, and the procedure is an open procedure within the scope of international treaties. Variants and partial tenders are not permitted.
Bidder eligibility
Eligibility criteria are specified in the tender documentation (referenced as Form A2 in the Ausschreibungsunterlagen). The notice itself does not list specific requirements. Bidding consortia are permitted, but multiple tenders from consortia are not. Subcontractors are permitted, but multiple tenders from subcontractors are not. Participation requires attendance at the mandatory site visit (see site_visit_required).
How bids are scored
Award criteria are specified in the tender documentation (Form A2). The notice does not disclose a price/quality split or weightings.
Key requirements
- General planner mandate covering SIA phases 32, 33, 41 and 51–53 for WWTP expansion
- Scope includes mechanical and biological expansion to 260,000 PE plus micropollutant (EMV) treatment stage for 330,000 PE
- Fee structure defined per Form A3; submission deadline 2027-01-15
Procurement contact
The notice names a procurement contact for clarification questions.
Relevant sectors
How this compares
About this sector
About this sector
Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)