Serbia: GrCF3 W2 - Novi Sad Solar-Thermal Plant Tender
Novi Sad District Heating Company
- Value
- $120.6M
- Closes
- Not stated · check listing
- Where
- Serbia
- Contract
- Works · Multilateral
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a multilateral institution covering construction and works. Delivery covers Serbia and the European Union. It is classified under Renewable Energy, Heating and Cooling and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures the design, construction, and commissioning of a solar-thermal heating plant for Novi Sad's district heating network, funded by the Green Climate Fund. The ideal bidder is an experienced renewable-energy and district-heating contractor with proven track record in combined solar-thermal systems and integration into existing heating infrastructure.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Construction of a large-scale solar-thermal plant for the Novi Sad District Heating system, including two seasonal heat storage units with a total volume of approximately 870,000 m³, a solar collector field of about 39,000 m² (31 MW capacity), heat pumps with 17 MW total capacity, and two electric boilers with 60 MW combined capacity. The project aims to decarbonise the district heating system by integrating renewable solar energy, ambient heat from the Danube River via heat pumps, and surplus electricity from the grid. The system will provide balancing capacity of up to 60 MW through Power-to-Heat technology, enabling sector coupling between the power system and district heating network. Consultant services include PIU support, procurement and contract management, supervision of construction works, and compliance with EBRD and national technical, environmental, and social requirements.
Bidder eligibility
Contracts are open for participation by firms from any country, unless otherwise specified in individual procurement documents. Bidders must register in the EBRD Client E-Procurement Portal (ECEPP) to participate. Contracts will be subject to the Bank's Procurement Policies and Rules.
Key requirements
- Solar-thermal plant design and construction for district heating
- Integration with existing Novi Sad district heating network
- GCF-funded project (multilateral climate finance)
- Renewable energy generation and heating-cooling system installation
Procurement contact
The notice names a procurement contact for clarification questions.
Relevant sectors
How this compares
About this sector
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)