Skip to content
Raise Lens
Tender · TED (EU)

Sewage treatment plant construction work – modernisation and expansion in Marczyce

Original: Sewage-treatment plant construction work – Modernizacja wraz z rozbudową oczyszczalni ścieków w Marczycach

Gmina Podgórzyn

Value
Not stated · check listing
Closes
1 Dec 2026
 
Where
Poland
Contract
Works · Government

Free accounts: 1 official link a month · Pro: every link

Raise Lens Pro

With Pro you could have had 16 days to prepare

See Raise Lens Pro
With Raise Lens Pro · seen 15 Nov 202616 days to prepare
Found today · 24 Nov 20267 days to prepare

In context

This is a contract notice published by a government body covering construction and works. Delivery covers Poland (Europe). It is classified under Water and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

A Polish municipality (Gmina Podgórzyn) is procuring a design-and-build contract to modernise and expand the Marczyce wastewater treatment plant to 12,500 population equivalent, while keeping the old plant running until the new one is commissioned. It suits experienced design-build contractors in water and wastewater engineering, with SMEs most likely to participate as subcontractors.

Summary by Raise Lens from the official notice · 18 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The Gmina Podgórzyn (government buyer) is procuring the modernisation and expansion of the sewage treatment plant in Marczycze (plots 11/5 and 180/1), delivered as Stage I under a 'design and build' (Zaprojektuj i wybuduj) formula. The contract covers complete design documentation (conceptual, building, technical and execution), technical specifications for construction and acceptance works (STWiORB/WWiORB), and obtaining all required permits, opinions and decisions, including the building permit. Physical construction must provide full technological functionality for 12,500 population equivalent (PE), with average daily flow Qd = 1,630 m³/d and peak hourly flow Qm = 280 m³/h (77.8 l/s). Stage I also includes receiving and buffering up to 100 m³/d of delivered wastewater, using a synchronised reception station and discharge pumps together with an adapted existing retention tank. The existing facility on plot 12/12 must keep operating until the new plant is stably commissioned, after which it must be decommissioned and preserved. Training, start-up, testing, handover to operation and a use permit (zezwolenie na użytkowanie) are included. Future expansion must be provided for: the design must reserve land and technical capacity for Stage II without demolition or rebuilding, including blind flanges, shut-off valves and free connection stubs on pipelines and collectors, spare power on main switchboards, free cable routes, and at least 25% spare space and signal capacity in control cabinets and the SCADA system. Treated effluent is to discharge to the Czerwonka stream via the existing outfall, subject to a hydrological and capacity analysis. If that outfall cannot take the Stage I volume, the contractor must build an alternative pressure-gravity system to the Podgórna stream (250PE SDR11 PN16 pressure main, DN400 PVC SN8 gravity section and a DN400 outlet in a stone wall at km 3+311). The tender has a base scope and an option (prawo opcji) covering the pressure-gravity system to the Podgórna stream and removal of conflicts with the 20 kV overhead lines operated by TAURON Dystrybucja S.A. The detailed scope is set out in the Functional-Utility Programme (PFU), Annex 11 to the SWZ. The expected duration is not stated on the page.

Key requirements

  • Design-and-build (Zaprojektuj i wybuduj) covering full design documentation, technical specifications and permits
  • Full technological functionality for 12,500 RLM capacity with reserved space and technical provisions for future expansion
  • Modernisation and expansion while the existing plant stays in operation until the new installation is commissioned

CPV codes

Relevant sectors

Water tendersInfrastructure

How this compares

About this sector

Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceTED (EU)
Published13 Nov 2026
Closes1 Dec 2026
Buyer typeGovernment
TypeWorks
DeliveryOn-site
CountryPoland
RegionEurope
Last verified18 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)