Site development work – A4 autoroute ecological compensation and landscaping
Original: Site-development work – AUTOROUTE A4 - 1ère PHASE D'AMENAGEMENT DU NOEUD - AUTOROUTIER A4/A35/A355 Travaux de mise en oeuvre de mesures compensatoires et aménagements écologiques (MC4) Site 1 : Site de Fer à cheval Site 2 : Site de Forlen
SANEF
- Value
- Not stated · check listing
- Closes
- Not stated · check listing
- Where
- France
- Contract
- Works · Soe
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a state-owned enterprise covering construction and works. Delivery covers France (Europe). It is classified under Water, Forestry and Reforestation and Biodiversity and Nature and 1 other against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures ecological compensation and landscaping works on two sites along the A4 autoroute in France, including site preparation, planting, seeding, fencing, and multi-year maintenance. Bidders should be experienced in ecological restoration, landscape construction, and vegetation management.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Site development and ecological compensation work for the A4/A35/A355 highway interchange (AUTOROUTE A4 - 1ère PHASE D'AMENAGEMENT DU NOEUD AUTOROUTIER). The project encompasses two sites: Site de Fer à cheval and Site de Forlen. Work includes site installation, topsoil stripping and stockpiling, terrain earthwork and reprofilng, vegetation preparation, material sorting and evacuation, topsoil reuse, afforestation (plant supply, transport, planting, and initial maintenance), biodegradable geotextile installation, peripheral fencing (2.5m height), seeding and turfing. Maintenance phase includes mechanical mowing with material export, watering, geotextile maintenance, weeding, and replacement of dead vegetation during the guarantee period.
Lots
- Lot 1: Site de Fer à cheval
Site-development and ecological compensation work including site installation, earthwork, vegetation preparation, planting, and maintenance
- Lot 2: Site de Forlen
Site-development and ecological compensation work including site installation, earthwork, vegetation preparation, planting, and maintenance
Key requirements
- Site preparation, topsoil stripping, stockpiling, and terrain reprofilage
- Plant supply, transport, installation, and maintenance including watering and replacement of dead vegetation
- Seeding, turfing, and biodegradable mulch installation across designated areas
- Multi-year maintenance including mechanical mowing, weeding, and vegetation care with material export
- Peripheral fencing installation (2.5 m height) and site demarcation
Relevant sectors
How this compares
About this sector
About this sector
Water funding covers supply, sanitation, wastewater treatment, water efficiency, catchment management and flood risk. A large share is public procurement for infrastructure and services, alongside grants for innovation and access in underserved areas. Bidders and applicants are typically assessed on technical capacity, operating experience and community impact.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)