Site supervision (OPC) mission for CARSAT Pays de la Loire headquarters rehabilitation
Original: Construction-site supervision services – Mission d'Ordonnancement, de Pilotage et de Coordination (OPC) pour le projet de réhabilitation et de transformation des locaux du siège de la CARSAT Pays de la Loire
Carsat Pays de la Loire
- Value
- Not stated · check listing
- Closes
- 4 Dec 2026
- Where
- France
- Contract
- Services · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering services. Delivery covers France (Europe). It is classified under Sustainable Buildings against the sustainability taxonomy rather than matched on keywords.
Summary
This public tender seeks an OPC contractor (scheduling, project management and coordination) for the rehabilitation and conversion of the CARSAT Pays de la Loire headquarters in Nantes, in two phases with an optional tranche. It suits a construction-project management firm that can deliver onsite scheduling and coordination, not a climate or sustainability specialist.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
The buyer, Carsat Pays de la Loire, is procuring an Ordonnancement, Pilotage et Coordination (OPC) mission, the French construction-site scheduling, steering and coordination service, for the rehabilitation and transformation of the headquarters premises in Nantes. The buyer considered splitting the contract into lots under Article L.2113-10 of the Code de la commande publique but decided against it under Article L.2113-11 2°, because the OPC services are indivisible and closely interdependent. The contract has two parts. The firm tranche (TF) covers all OPC services for the firm-tranche works, from the design phases concerned through preparation and execution of works, pre-reception operations, reception, and lifting of reservations. Its tasks include preparing, analysing and updating the operation's schedules, analysing task sequencing and critical paths, coordinating the timing of all contractors, tracking progress, identifying deviations, and proposing corrective measures to meet calendar objectives. OPC services directly tied to the optional works are excluded from the firm tranche. The optional tranche (TO001) covers OPC services specific to replacing the external joinery, the external solar protections (including motorisation), and the roof waterproofing system of the R+1 terraces. It is conditional on the contracting authority confirming it through a service order (ordre de service). It includes integrating these works into the overall organisation, phasing and schedule, and coordinating them with the firm-tranche services through to reception and lifting of reservations, as set out in the CCTP (technical specifications). Expected duration is not stated in the extract provided.
Key requirements
- Scheduling, planning and critical-path analysis for the headquarters renovation works
- Onsite coordination of contractors from design through construction, pre-reception and snagging
- Firm tranche covers works excluding exterior joinery, solar protections and roof waterproofing, which form an optional tranche
Relevant sectors
How this compares
About this sector
About this sector
Sustainable buildings funding covers low-energy new build, deep retrofit, building performance data and healthier indoor environments. Public owners procure design and works through tenders, while grants support innovation and community schemes. Bids are usually judged on measured performance, cost and delivery experience in occupied buildings.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)