This tender has closed. The deadline passed 99 days ago.
You can no longer apply, but the details below are kept for reference, and there are similar open opportunities in the sidebar.
Solar photovoltaic modules – Expansion of photovoltaic farm with supporting infrastructure in a Polish municipality – PHASE II 2026 Tender
organisation
In context
This is a contract notice published by a government body covering construction and works. Bids are invited through an open procedure. Delivery covers Poland and the European Union (Europe). It is classified under Renewable Energy against the sustainability taxonomy rather than matched on keywords.
This tender procures design, supply, installation, and commissioning of a 659.88 kWp solar photovoltaic farm expansion (Phase II) in rural Poland, connecting to existing 20/0.4 kV grid infrastructure. Bidders should be qualified solar EPC contractors with experience in utility-scale PV deployment, grid integration, and SCADA system interfacing.
Unlock the funder, link and full detail
Create a free account to unlock 3 full listings a month, including the funder name, the application link and the complete programme detail.
About this tender
The subject of the contract is the implementation of Stage II of an investment consisting of the construction of a photovoltaic farm and its connection to the existing 20/0.4 kV transformer station and the existing telemechanics system (completed under Stage I). Stage II covers the supply, installation, and commissioning of a photovoltaic installation with a capacity of 659.88 kWp, constituting an expansion of the infrastructure built in Stage I. The target total power of the farm after expansion will be 1.56 MW. …
Relevant sectors
The direct link to bid is a Pro feature.