Summary

Framework agreement for acquisition and installation of solar plants across Ukraine, targeting renewable energy deployment at scale. Bidders should have solar PV system design, procurement, and installation expertise with capacity to deliver multiple sites.

Summary by Raise Lens from the official notice · 18 Oct 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

Framework agreement for the acquisition and installation of solar plants (SPP) on the territory of Ukraine, specifically in Kyiv. The scope includes supply of solar panels (minimum 400W nominal power, >21% conversion factor), hybrid inverters (minimum 5kW nominal power, ≥92% efficiency), LiFePo4 storage batteries (minimum 2kWh capacity), and complete installation services. Deliverables include system design, detailed engineering calculations, installation by qualified professionals, post-installation maintenance and technical support during warranty period (5 years for panels, 2 years for inverters, 1 year installation warranty). Contract duration is 550 days after signing, with an 18-month framework agreement term. No contract extension permitted.

Bidder eligibility

Supplier qualification: at least 3 years of experience in solar energy market; officially registered; relevant licenses and certificates. Previous experience (20% evaluation weight): demonstrated implementation of at least 3 similar SPP projects or total completed project cost not less than USD 50,000. Equipment and resources (15%): own or subcontracted capacity to supply/install equipment; infrastructure availability (logistics, transportation, warehouses, machinery). Human resources (15%): certified personnel with training in electrical safety, solar system installation, equipment operations; professionals with electrical safety certificates for installations up to 1,000V or higher. Equipment must comply with international standards (ISO, IEC). Subcontracting and consortium participation not permitted. Only single bidders allowed.

How bids are scored

Weighted scoring model: Previous experience (20%); Availability of equipment and resources (15%); Human resources (15%); Cost/price criterion (25%); Qualitative equipment characteristics/technical specifications (15%); Order fulfillment term based on facility survey to assembly per SPP installation calendar (10%). All bids evaluated against all award criteria with specified weightings.

Key requirements

  • ✓Solar plant acquisition and installation capability
  • ✓Delivery across multiple sites in Ukraine territory
  • ✓Framework agreement structure implies multi-year/multi-tranche delivery readiness

Procurement contact

The notice names a procurement contact for clarification questions.

Relevant sectors

About this sector

Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.