Skip to content
Raise Lens
Tender · eTenders (Ireland)

Solar PV Replacement and EV Charging Station Installation 2026 Tender

Loughs Agency

Value
€180K
Closes
30 Nov 2026
 
Where
Ireland
Contract
Works · Government

Free accounts: 1 official link a month · Pro: every link

Raise Lens Pro

With Pro you could have had 27 days to prepare

See Raise Lens Pro
With Raise Lens Pro · seen 3 Nov 202627 days to prepare
Found today · 24 Nov 20266 days to prepare

In context

This is a contract notice published by a government body covering construction and works. Delivery covers Ireland and United Kingdom (Europe). It is classified under Renewable Energy and Electric Mobility against the sustainability taxonomy rather than matched on keywords.

Summary

The Loughs Agency seeks a contractor to replace the solar PV system (panels, inverters, mounting) at its Prehen headquarters and to supply and install EV charging stations at three sites in Northern Ireland and Ireland. A small-to-mid-sized electrical or renewables installer with PV and EV charger experience would fit well.

Summary by Raise Lens from the official notice · 21 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

Loughs Agency is procuring works to replace the existing solar PV system at its Headquarters in Prehen, Derry~Londonderry. The replacement covers new PV panels, inverters and mounting system, plus installation, commissioning and integration of the new system, with the stated aim of substantially increasing self-generated renewable electricity. In parallel, the Agency requires supply and installation of EV charging stations at three sites: its Headquarters and its regional offices in Omagh and Carlingford. This supports the transition of the Agency's vehicle fleet to electric vehicles. The procurement is a works contract under Directive 2014/24/EU (Classic), run as an open procedure. The page states a contract duration of 0 months, which appears to be a placeholder, so the actual delivery period is not specified. Tender validity is 90 days.

How bids are scored

Most Economically Advantageous Tender (MEAT). The page does not disclose any price/quality split or weightings.

Key requirements

  • Replacement of existing solar PV panels, inverters and mounting system at Prehen HQ
  • Installation, commissioning and integration of new PV system
  • Supply and installation of EV charging stations at HQ, Omagh and Carlingford offices

Procurement contact

The notice names a procurement contact for clarification questions.

How this compares

About this sector

Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceeTenders (Ireland)
Published3 Nov 2026
Closes30 Nov 2026, 15:00 UTC
Buyer typeGovernment
TypeWorks
DeliveryOn-site
CountryIreland
RegionEurope
CurrencyEUR
Value (USD)$198K
Budget range€180K
SubmissionElectronic submission through the Irish eTenders platform (European Dynamics), w
Last verified21 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)