Steam, hot water and associated products – CTR, FVC – Dampgeneratorer Tender
CTR I/S
In context
This is a contract notice published by a utility covering the supply of goods. Bids are invited through an open procedure. Delivery covers Denmark and the European Union (Europe). It is classified under Renewable Energy, Energy Efficiency and Industrial Decarbonization against the sustainability taxonomy rather than matched on keywords.
This tender procures two electric steam generators (replacing fossil-fuel oil boilers) for a district heating central plant in Copenhagen, Denmark, as part of a decarbonization strategy; bidders should have expertise in industrial electric boiler systems, steam generation, and heat accumulation tank integration.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
CTR I/S is procuring two electric steam generators (dampgeneratorer) for integration with a heat accumulation tank (VAK) at Frederiksberg Heat Central (FVC). This project is part of CTR's strategy to phase out fossil fuels by replacing two of four existing oil boilers with electric boilers. The steam generators will produce steam cushioning at the top of the VAK to maintain appropriate pressure in the VAK and the wider district heating system at FVC, ensuring that district heating water does not boil given maximum supply temperatures of 120°C. The procurement includes supply of 2 electric steam generators for the steam generator system, plus an optional service agreement. The project also encompasses establishment of the VAK and associated high-voltage installation, though these are being procured separately by other contractors. The heat central modernization involves modification of the boiler hall.
Key requirements
- ✓Supply of 2 electric steam generators (dampgeneratorer) for heat accumulation tank (VAK) at Frederiksberg district heating central
- ✓Generators must produce steam cushion to maintain pressure in VAK and district heating system (prevent boiling at 120°C flow temperature)
- ✓Replacement of 2 of 4 existing oil boilers with electric capacity as part of fossil-fuel phase-out strategy
- ✓Optional service/maintenance agreement included in scope
- ✓Integration with new high-voltage electrical installation and VAK commissioned by other contractors
Relevant sectors
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Quick facts
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →