STEP Engineering System Partners Procurement 2027 Tender
UK Fusion Energy Ltd
- Value
- £115.0M
- Closes
- 29 Jan 2027
- Where
- United Kingdom
- Contract
- Services · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering services. Bids are invited through a framework agreement. Delivery covers United Kingdom (Europe). It is classified under Fusion and Nuclear and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
UK Fusion Energy Ltd is procuring system partner suppliers across five lots to support engineering design and delivery of the STEP prototype fusion power plant, with contracts of two years plus extensions capped at four years. Suited to large engineering consortia or established suppliers with nuclear or fusion delivery capacity, not early-stage firms.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
UK Fusion Energy Ltd (UKFE) is seeking to procure suitable Suppliers, either individual organisations, consortia or joint ventures, across 5 Lots to support delivery of the UK's prototype fusion energy plant under the Spherical Tokamak for Energy Production (STEP) programme. The STEP programme aims to deliver a prototype fusion energy plant by 2040 and to build a fusion supply chain and a pathway to commercial fusion. The page describes the work as an unprecedented and complex engineering design alongside a major infrastructure project with a large, diverse supply chain. The Lot descriptions on the page are only an overview. The definitive statement of requirements is set out in the Capability Statements provided with the procurement documents, which are not reproduced on this page. The term under each Lot is two years, with an option to extend for one year on two occasions at UKFE's discretion. The total contract length will not exceed four years. Maximum values for each Lot include expenses (excluding VAT) for the initial term and extension periods, but the Lot values are not shown in the extracted text. Full tender documents are published on the Delta eSourcing portal (ukfe.delta-esourcing.com, reference 3M5EHF9G8W), where responses are also submitted.
Key requirements
- Engineering design and delivery support for the STEP prototype fusion energy plant across five lots
- Contract term of two years with two optional one-year extensions, maximum four years in total
- Maximum value per lot stated in the procurement documents, including expenses and extensions, excluding VAT
- Suppliers may bid as an individual organisation, consortium or joint venture, per the Capability Statements
Relevant sectors
How this compares
About this sector
About this sector
Climate-related engineering and infrastructure covers water and wastewater systems, flood defences, transport and rail, electricity networks and environmental studies. Almost all of it is public procurement for design, studies and works, often under framework agreements. Bidders are usually assessed on technical capacity, professional accreditation and delivery of comparable schemes.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in framework agreements; typical only, not this buyer’s list. Check the official notice.
- Selection questionnaire or qualification form
- Company registration certificate
- Audited financial statements
- Insurance certificates
- Case studies or references for similar work
- Quality, health and safety, and environmental policies