Skip to content
Raise Lens
Tender

Study and supervision of works for Greater Nador flood protection, phase 2 2026 Tender

Original: Etude et suivi d’exécution des travaux de protection du Grand Nador contre les inondations de l’Oued Caballo – Tranche 2

DIRECTEUR DES AMENAGEMENTS HYDRAULIQUES

Value
Not stated · check listing
Closes
9 Nov 2026
 
Where
Morocco
Contract
Consulting · Government

Free accounts: 1 official link a month · Pro: every link

In context

This is a contract notice published by a government body covering consulting. Bids are invited through an open procedure. Delivery covers Morocco (MENA). It is classified under Climate Adaptation and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

This open tender procures engineering design studies and works supervision for flood protection of Greater Nador against Oued Caballo flooding, phase 2. It suits established engineering consultancies and hydraulic engineering firms with flood-defence experience in Morocco, rather than early-stage startups.

Summary by Raise Lens from the official notice · 1 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

Etude et suivi d’exécution des travaux de protection du Grand Nador contre les inondations de l’Oued Caballo – Tranche 2 Procédure : Appel d'offres ouvert Lieu d'exécution : NADOR Référence : 105/2026/DAH

Key requirements

  • Design study for Oued Caballo flood protection works, tranche 2
  • Supervision of execution of flood protection works in Nador
  • Open tender, reference 105/2026/DAH, closing 2026-11-09

Relevant sectors

Adaptation tendersInfrastructure

How this compares

About this sector

Climate adaptation funding helps communities, infrastructure and businesses prepare for heat, flooding, drought and sea level rise. Most of it is public and multilateral money, often targeted at vulnerable regions and delivered with local government. Calls usually ask for a climate risk assessment and evidence that local people shaped the plan.