Substation equipment – Remote control and communications system cabinets
Original: Substation equipment – Ormari za opremu sustava daljinskog vođenja i komunikacija
HEP-Operator distribucijskog sustava d.o.o.
- Value
- €169K
- Closes
- Not stated · check listing
- Where
- Croatia
- Contract
- Supplies · Utility
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a utility covering the supply of goods. Delivery covers Croatia and the European Union (Europe). It is classified under Grid Modernisation and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
This tender procures cabinets/enclosures for remote control and communication equipment systems for an electrical distribution network, in compliance with Croatian standards. Bidders should be equipment manufacturers or suppliers specializing in industrial control and telecommunications infrastructure for utility networks.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
HEP-Operator distribucijskog sustava d.o.o., the Croatian electricity distribution system operator, conducted an open procurement procedure for the supply of cabinets for remote control and communications system equipment (Ormari za opremu sustava daljinskog vođenja i komunikacija) in accordance with the technical specification (DON). The supplies are intended for HEP-ODS distribution areas, with exact delivery locations specified in individual purchase orders issued under the framework agreement. The procurement was structured as a framework agreement without reopening of competition. The estimated total value of the framework was EUR 169,000 excluding VAT. The contract awarded under this notice (S43-2042/24-33) was concluded on 11 February 2026 with IEL d.o.o. of Zagreb at a value of EUR 3,789.39. The project is partially financed by EU funds under the European Union Recovery Instrument (EURI) 2021/2027, supporting the 'Modernizacija hrvatske distribucijske elektroenergetske mreže' (Modernization of the Croatian electricity distribution network) programme.
Bidder eligibility
Standard EU utilities procurement eligibility under Directive 2014/25/EU applied. The procurement is covered by the WTO Government Procurement Agreement (GPA). A minimum warranty period of 12 months was required per the technical specification (point A.2). No further specific bidder qualification criteria are disclosed in this award notice.
How bids are scored
Most economically advantageous tender with two criteria: Price (Cijena ponude) weighted 90 points, and Quality – Warranty period (Jamstveni rok) weighted 10 points. A longer warranty period beyond the minimum 12 months provided additional points.
Key requirements
- Cabinets for remote control and communication equipment systems
- Compliance with DON (Croatian distribution network standards)
- Suitable for electrical utility distribution infrastructure
Recent prior contract holders
- IEL d.o.o. · 2026 · $4,168Ormari za opremu sustava daljinskog vođenja i komunikacija (S43-2042/24-33)
Procurement contact
The notice names a procurement contact for clarification questions.
CPV codes
CPV codes
Relevant sectors
How this compares
About this sector
About this sector
Grid modernisation covers transmission, distribution, smart meters, interconnectors and the software that balances a network with more variable supply. Funding comes as innovation calls for network operators and suppliers as well as large public tenders for equipment and works. Applicants are usually asked to show technical readiness and experience working with regulated network companies.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)