This tender closed on 23 July 2026. The deadline passed 126 days ago.
You can no longer apply, but the details below are kept for reference. Similar calls still open:
Supply and install fiber-optic infrastructure for COP16 Biodiversity Ecopark
Original: Suministrar e instalar la infraestructura física de la fibra óptica desde el punto de entrada hasta las zonas de bienestar e internas del ecoparque de la biodiversidad COP16 (Manifestación de interés
- Value
- COP 208.9M
- Closes
- 23 Jul 2026Closing date passed
- Where
- Colombia
- Contract
- Mixed · Government
In context
This is a contract notice published by a government body covering a mix of works, supplies and services. Delivery covers Colombia (LatAm). It is classified under Biodiversity and Nature against the sustainability taxonomy rather than matched on keywords.
Summary
Supply and install fiber-optic infrastructure and communications equipment from entry point to internal zones of the COP16 Biodiversity Ecopark in Cali, Colombia, integrated with the REMI network to provide internet connectivity. Bidders should have expertise in telecommunications infrastructure, fiber-optic installation, network integration, and experience with large-scale environmental/public facility projects.
This tender has closed
Similar tenders are open now. Pro keeps the official link on every listing, closed ones included.
About this tender
Supply and install physical fiber optic infrastructure from entry point to welfare zones and internal areas of the COP16 Biodiversity Ecopark, including communications equipment with connection and integration to the integrated REMI network, to guarantee internet service within the framework of the project named CONSERVATION OF THE MAIN ECOLOGICAL STRUCTURE OF SANTIAGO DE CALI (project reference BP-26005491). The scope includes provision of materials, installation, testing, and integration with existing REMI network infrastructure.
Bidder eligibility
Bidders must be registered with relevant Colombian authorities (RUES, DIAN, or equivalent), possess technical capacity in fiber optic infrastructure installation, have experience in telecommunications projects, and demonstrate financial standing appropriate to the contract value. Colombian vendors or foreign vendors with legal representation in Colombia are eligible.
Key requirements
- Supply and install fiber-optic physical infrastructure from entry point to internal zones
- Integrate communications equipment with REMI integrated network
- Guarantee internet service delivery for COP16 Biodiversity Ecopark conservation project
- Project reference BP-26005491 under ecological structure conservation framework
Relevant sectors
How this compares
About this sector
About this sector
Biodiversity funding backs habitat restoration, species protection, protected areas and nature-positive business. It comes from environment agencies, multilateral nature funds and conservation philanthropy, often through competitive calls with defined regions. Applicants are usually asked for baseline surveys, local partners and indicators that show ecological change.
This opportunity has closed. Find the next one
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Alert me to similar opportunities →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)