Skip to content
Raise Lens
TENDER · spain-pcspgovernmentworks

Supply and installation of electric vehicle charging infrastructure 2026 Tender

Original: Suministro e instalación de Infraestructura de Recarga de Vehículos Eléctricos

Alcaldía del Ayuntamiento de El Carpio de Tajo

In context

This is a contract notice published by a government body covering construction and works. Bids are invited through an open procedure. Delivery covers Spain and the European Union (Europe). It is classified under Electric Mobility, Sustainable Buildings and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.

Summary

This tender procures the supply and installation of electric vehicle charging infrastructure for a Spanish municipality. Bidders should have expertise in EV charging systems, electrical installation, and infrastructure deployment.

Summary by Raise Lens from the official notice · 24 Oct 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The Alcaldía del Ayuntamiento de El Carpio de Tajo (Toledo, Castilla-La Mancha, Spain) is procuring the supply and installation of electric vehicle charging infrastructure (Suministro e instalación de Infraestructura de Recarga de Vehículos Eléctricos). The contract is classified as a supply contract (Suministros) and is file 1056/2026. The place of execution is El Carpio de Tajo, Toledo. The CPV codes cover battery chargers, electrical machinery and equipment, electrical installation and cabling works, electrical line construction, communication software packages, and project design, budgeting and drafting. The scope therefore appears to combine equipment supply with electrical installation works and design services, though the detailed technical specifications are contained in the tender documents (Pliego and Anuncio de Licitación), which were not accessible from this page. The procedure is an open simplified procedure (Abierto simplificado) under ordinary processing. The tender is not co-financed with EU funds. The contract duration and delivery or installation timelines are not stated on this page.

Key requirements

  • ✓Supply of EV charging infrastructure equipment
  • ✓Installation and commissioning of charging stations
  • ✓Compliance with Spanish and EU electrical standards
  • ✓Project value approximately €66,000

Relevant sectors

About this sector

Electric mobility funding supports electric vehicles, charging infrastructure, battery supply chains and fleet transition for buses, vans and trucks. Public authorities buy vehicles and charge points through tenders, while grants back pilots and manufacturing. Applicants usually need site plans, grid capacity checks and an operator for the finished assets.

€66K
Closes 9 Nov 2026
Get the official link (free account)

Free accounts: 1 official link a month · Pro: every link

Quick facts

Sourcespain-pcsp
Published23 Oct 2026
Closes9 Nov 2026
Buyer typegovernment
Typeworks
Methodopen
DeliveryOn-site
CountryES
RegionEurope
CurrencyEUR
Value (USD)$72K
Budget range$60K
SubmissionElectronic submission via the Plataforma de Contratación del Sector Público (Ele
Last verified24 Oct 2026

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Related tenders