Skip to content
Raise Lens
Tender · Compras Gov (Brazil)

Supply, fabrication and installation of metal lean-to roof over recycling shed pillars

Original: Contratação de empresa especializada para o fornecimento de materiais, fabricação, transporte e execução de cobertura metálica do tipo meia água, a ser instalada sobre os pilares pré-existentes no Barracão de Reciclagem do Município de São Jorge d'Oeste/PR, contemplando a confecção e montagem de tesouras, terças, contraventamentos e travamentos metálicos pintados, telhamento em aço galvanizado de 0,50 mm, calhas, condutores e acessórios de acabamento, em estrita conformidade com o Projeto Comple

MUNICIPIO DE SAO JORGE D'OESTE

Value
BRL 40K
Closes
1 Dec 2026
 
Where
Brazil
Contract
Works · Government

Free accounts: 1 official link a month · Pro: every link

Raise Lens Pro

With Pro you could have had 18 days to prepare

See Raise Lens Pro
With Raise Lens Pro · seen 13 Nov 202618 days to prepare
Found today · 24 Nov 20267 days to prepare

In context

This is a contract notice published by a government body covering construction and works. Delivery covers Brazil (LatAm). It is classified under Circular Economy against the sustainability taxonomy rather than matched on keywords.

Summary

A São Jorge d'Oeste municipality tender for supplying, fabricating, transporting and installing a galvanized-steel half-water roof on existing pillars at its recycling shed. Suited to a small local construction or metal-structure contractor able to deliver a roughly BRL 40K works package.

Summary by Raise Lens from the official notice · 14 Nov 2026Accurate?

Get the official link (free account)

Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.

About this tender

The Municipality of São Jorge d'Oeste (PR, Brazil) is procuring a specialized contractor to supply materials, fabricate, transport and install a metal half-water (meia água) roof cover. The structure is to be placed on the existing pillars of the Recycling Barracão (Barracão de Reciclagem). Scope, as described in the title, includes manufacturing and assembly of metal trusses (tesouras), purlins (terças), bracing and metal tie members (contraventamentos e travamentos), all painted; 0.50 mm galvanized steel roofing sheets; gutters (calhas), downpipes (condutores) and finishing accessories. Work must strictly follow the project documents, which the title identifies as the 'Projeto Completo', though the page text is truncated before the full reference. The page content provided is cut off after the title, so the contract duration, delivery schedule, quantities, and the full list of deliverables are not visible in the text supplied. These details should be confirmed in the full edital on the PNCP portal.

Key requirements

  • Supply, fabrication, transport and assembly of metal trusses, purlins and bracing, painted
  • Galvanized steel roofing sheet 0.50 mm, with gutters, downpipes and finishing accessories
  • Execution strictly per the attached project on existing pillars at the municipal recycling shed

Relevant sectors

How this compares

About this sector

Circular economy funding supports reuse, repair, remanufacturing, product redesign and secondary materials markets. Grants tend to back pilots with businesses and local authorities, while tenders buy collection, sorting and recovery services. Applicants are usually asked to show the material flows involved and who will buy the recovered output.

Get alerts for notices like this

Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.

Get alerts, free →

Quick facts

SourceCompras Gov (Brazil)
Published12 Nov 2026
Closes1 Dec 2026
Buyer typeGovernment
TypeWorks
DeliveryOn-site
CountryBrazil
RegionLatAm
CurrencyBRL
Value (USD)$8,092
Last verified14 Nov 2026

Documents to prepare

We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.

  • Technical proposal and methodology
  • Financial proposal or price schedule
  • Company registration certificate
  • Audited financial statements
  • CVs of the proposed key experts
  • References for similar contracts
  • Signed declarations (eligibility, conflict of interest)