Supply, Installation, Testing, and Commissioning of Solar-Powered Water Pumping Systems, for the Mesjid Irrigation Scheme in the Afar Region of Ethiopia
FAO
- Value
- Not stated · check listing
- Closes
- 15 Dec 2026
- Where
- Ethiopia
- Contract
- Supplies · Un agency
Free accounts: 1 official link a month · Pro: every link
Pro early accessIn public feeds and alerts from 1 Dec. This page is open to everyone now.
In context
This is a contract notice published by a UN agency covering the supply of goods. Delivery covers Ethiopia (Africa). It is classified under Renewable Energy and Water against the sustainability taxonomy rather than matched on keywords.
Summary
FAO is procuring the supply, installation, testing and commissioning of solar-powered water pumping systems for an irrigation scheme in Ethiopia's Afar Region. Suited to bidders with solar pumping and irrigation installation experience in East Africa, likely SMEs or regional contractors able to deliver on-site works.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
This supplies contract covers the supply, installation, testing and commissioning of solar-powered water pumping systems for an irrigation scheme in the Afar Region of Ethiopia. The works are to be carried out on site, and bidders must show prior experience with solar PV pumping and irrigation systems. The buyer is a United Nations agency operating in Ethiopia. The notice is published under the Africa region and covers Ethiopia alone. The sectors are renewable energy and water. The notice was published on 23 November 2026 and closes on 15 December 2026.
Key requirements
- Supply of solar-powered water pumping systems for irrigation
- Installation, testing and commissioning on site in Afar Region, Ethiopia
- Solar PV pumping and irrigation system experience required
Relevant sectors
How this compares
How this compares
- Compared with 11 similar tenders (renewables in Ethiopia) listed in the last 12 months.
- It allows 22 days to respond, longer than the typical 14 days across 11 similar tenders.
- The same organisation listed 3 other similar tenders here in the last 12 months.
Closest open tenders
Figures are computed from notices listed on Raise Lens in the same sector and country over the last 12 months.
About this sector
About this sector
Renewable energy funding covers solar, wind, hydropower, geothermal and bioenergy, from early research to grid-scale deployment. Public money tends to back demonstration, grid connection and access to energy in emerging markets, while procurement notices buy installation, operation and maintenance. Calls often ask for proof of resource assessment, permitting progress and local partners.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)