Sustainability and multi-year maintenance (MJOP) for municipal facilities - Stein
Original: Verduurzaming en MJOP gemeentelijke accommodaties - Gemeente Stein
Gemeente Stein
- Value
- Not stated · check listing
- Closes
- 8 Dec 2026
- Where
- Netherlands
- Contract
- Works · Government
Free accounts: 1 official link a month · Pro: every link
In context
This is a contract notice published by a government body covering construction and works. Delivery covers Netherlands (Europe). It is classified under Energy Efficiency and Engineering and Infrastructure against the sustainability taxonomy rather than matched on keywords.
Summary
The Municipality of Stein is procuring building and installation works to sustainably retrofit and maintain about 35 municipal facilities, split into two lots (Merode and Steinerbos) as Phase 1 of its sustainability programme. Suited to established Dutch construction and installation contractors, including SMEs that can deliver a single cluster of buildings.
Get the official link (free account)
Create a free account to open the official notice and application link: 1 official link a month, free. Pro opens every link.
About this tender
Gemeente Stein, together with its affiliated entity Steinerbos BV, planned to structurally sustainabilise its public accommodations and carry out the linked maintenance measures. The municipal property portfolio covers about 35 accommodations across five villages: Stein (kleine Meers), Elsloo (grote meers), Urmond, Berg aan de Maas and Meers. This procurement covered Phase 1 of the integrated sustainability programme, as set out in the Accommodatiebeleid 2025-2029 and the Routekaart Verduurzaming Vastgoed (2025). The scope is the construction and building-services installation work for sustainability and maintenance measures. General routine maintenance with no direct link to the sustainability programme is expressly excluded. The contract is divided into two lots (percelen): Perceel 1 (Cluster Merode) and Perceel 2 (Cluster Steinerbos). The planned contract start was 2 February 2027 and completion was planned for 30 April 2028. The notice is marked as terminated: the contracting authority ended the procedure early, and the page refers to a separate termination publication for details. A related award announcement is listed with a date of 9 November 2026, but the page does not show an awardee.
Lots
- Lot 1: Perceel 1: Cluster Merode
Sustainability and maintenance works (construction and installation) for the Cluster Merode accommodations, as part of Phase 1 of the integrated programme. Detailed scope not stated on the page.
- Lot 2: Perceel 2: Cluster Steinerbos
Sustainability and maintenance works (construction and installation) for the Cluster Steinerbos accommodations, as part of Phase 1 of the integrated programme. Detailed scope not stated on the page.
Key requirements
- Building and installation works for sustainability and maintenance measures across two clusters (Merode and Steinerbos)
- Scope limited to Phase 1 of the programme per Accommodatiebeleid 2025-2029 and Routekaart Verduurzaming Vastgoed (2025)
- General routine maintenance without a sustainability link is excluded
Relevant sectors
How this compares
About this sector
About this sector
Energy efficiency funding covers building retrofits, industrial process upgrades, heat recovery, efficient equipment and demand reduction. It arrives as grants for audits and capital works, as support schemes run by agencies and utilities or as public tenders for retrofit and energy services. Applicants usually need a baseline of current energy use and a measured saving.
Free accounts: 1 official link a month · Pro: every link
Get alerts for notices like this
Create a free account and we save a search for this sector and country, so new tenders like this one arrive in your weekly email.
Get alerts, free →Quick facts
Documents to prepare
We found no document list in this notice. Usually asked for in tenders and RFPs; typical only, not this buyer’s list. Check the official notice.
- Technical proposal and methodology
- Financial proposal or price schedule
- Company registration certificate
- Audited financial statements
- CVs of the proposed key experts
- References for similar contracts
- Signed declarations (eligibility, conflict of interest)